Original source · versioned page text
2014-12-09 Planning & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014 Open Space The Code requires the development to provide open space in accordance with the following: “Active Parkland or open space linkage to Active Parkland is provided in accordance with the Priority Infrastructure Plan in Part 15;” or “Park contributions are paid in accordance with the applicable infrastructure charging instrument.” The applicant is seeking to provide a playground within the park on neighbouring land in lieu of Park Contributions for the development. This is proposed to be delivered through an Infrastructure Agreement as part of the REC13/0146 and Councils Priority Infrastructure Plan (PIP). Under the Sustainable Planning Act 2009, local parks and equipment may be considered as trunk infrastructure and accordingly applicants are entitled to an offset in their infrastructure charges. It is anticipated this will be addressed through the Negotiated Decision process once the Infrastructure Agreement is finalised. Overlay Provisions The following overlay codes are applicable to this application: Biodiversity Overlay Code – Riparian Buffer Area Natural Hazards Overlay Code – Flood Hazard Area Natural Resources Overlay Code – Extractive Resource Buffer Area Natural Resources Overlay Code – Gas Pipeline Buffer Area Biodiversity Overlay Code Approximately 50% of the site is affected by Riparian Buffer area. The mapped buffers are not centrally located over the watercourses and do not follow the meander of either tributary, but range in width from zero to 20m from the top of bank. The applicant proposes to rehabilitate most of the riparian buffers and 10m from the top of bank for the full length and both sides of the waterways, including the portion of the waterway not affected by the Riparian Buffer Overlay. A portion of the riparian buffer on the south western side of the eastern tributary is not being rehabilitated as a playground is proposed as part of the adjoining subdivision REC13/0146. All lots are outside the riparian buffer except for a small western portion of lot’s 15 and 16. The rear boundary of lot 15 is setback 7.5m from the top of bank which is not sufficient. To help maintain water quality and provide sufficient area for maintenance activities a condition is recommended to remove any portion of lot 15 from within the riparian buffer area. The location of the riparian buffer on lot 16 is a result of the mapping inconsistency over the waterway, as there is currently more than a 20m setback to the rear boundary of lot 16, which is sufficient for a Stream Order 3 setback. Provided lot 15 is removed from within the riparian buffer the proposal complies with the provisions of the Biodiversity Overlay Code. Natural Hazards Overlay – Flood hazard area Approximately 70% of the land is flood affected, being below the flood level of a Q100 event. The applicant provided a Flood Assessment that considers land areas subject to 4 current development applications (being the subject application, REC13/0146, REC13/0148 and REC14/0009). The proposed flood strategy is not a fully conventional detention system, using a variety of storage methods to achieve a non-worsening at the site boundaries. The proposed methods include deliberately “roughing” the flood ways by utilising riparian vegetation, excavating side storage adjacent to the western tributary, channel re-profiling, and a restrictive footbridge across the eastern tributary and 2 bio basins. The Flood Assessment strategy’s modelling suggests that there is no risk to surrounding residences and a proposed non-worsening at any flood affected boundary in a Q100 event. Page 33 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.