PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
Pedestrian and Bicycle Facilities
24. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a new 2 metre wide footpath within the road verge for the entire length of the
site’s frontage to Elm Street;
b. a 2 metre wide footpath along southern side of the new road and extending to
the existing pathway in Blue Wren Close;
c. a 2 metre wide path across the frontages of proposed lots 33 and 34;
d. a 2 metre wide footpath between lots 46 and 47 extending from the new path in
Elm Street to the path in the new road; and
e. Pram crossings where applicable.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual, and must include in
particular:
a. the works generally as shown on drawing number 1225-33 revision A and dated
06/14 prepared by Callaghan and Toth;
b. provision of kerb adapters for all new lots; and
c. extension of the site stormwater system to accommodate stormwater from
external to the site, including registration of drainage easements.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
26. All elements of the stormwater drainage system, including any necessary scour
protection, must be wholly contained within the subject site, existing and/or new road
reserves.
Easements
27. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
28. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
29. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
30. All fill and associated batters must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
31. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
Page 63 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.