PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
32. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
33. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Electricity and Telecommunication Services
34. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
35. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
36. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Street and Pathway Lighting
37. Street lighting and pathway lighting throughout the subdivision shall have a high
energy efficient rating to the reasonable satisfaction of Council and shall generally be
provided in accordance with the principles of Council’s Planning Scheme Policy 5.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect which are
taken to be a water approval for a staged connection. Any future applications must be
made to Unitywater under South East Queensland (Distribution and Retail) Restructuring
Act 2009. Unitywater can be contacted at [email protected]
Water and Sewerage
38. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they will
serve.
b. An approved water meter for each lot in accordance with Unitywater and SEQ
Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water main
located in Blue Wren Place to service each lot within the proposed subdivision
in accordance with Unitywater and SEQ Standard Drawings.
d. Water meters must be located on alternative boundaries to electrical pillars.
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second.
39. Reticulated sewerage must be provided to each lot in the development. This must
include:
a. Ensuring sewer house drains are wholly contained within the Lot they will serve.
b. Provision of sewerage infrastructure to within the property boundaries of each
lot within the proposed subdivision.
Page 64 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.