Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    32.   Where the development involves excavation or filling over, or adjacent to, drainage,
          water supply or sewerage infrastructure, all access chamber surface levels must be
          adjusted to provide a freeboard of 100mm above the finished ground surface level.
    33.   All retaining walls must be designed and constructed in accordance with the planning
          scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
          retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
          with a commercial grade safety fence.
    Electricity and Telecommunication Services
    34.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    35.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    36.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Street and Pathway Lighting
    37.   Street lighting and pathway lighting throughout the subdivision shall have a high
          energy efficient rating to the reasonable satisfaction of Council and shall generally be
          provided in accordance with the principles of Council’s Planning Scheme Policy 5.
    UNITYWATER
    The following Unitywater conditions are applied in accordance with the South East
    Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
    Connections Policy. The conditions below form part of a water connection aspect which are
    taken to be a water approval for a staged connection. Any future applications must be
    made to Unitywater under South East Queensland (Distribution and Retail) Restructuring
    Act 2009. Unitywater can be contacted at [email protected]
    Water and Sewerage
    38.   Reticulated water must be provided to each lot in the development. This must
          include:
          a.   Ensuring that internal water pipes are wholly contained within the lot they will
               serve.
          b.   An approved water meter for each lot in accordance with Unitywater and SEQ
               Standard Drawings.
          c.   Provision of a water service from the existing 100mm diameter water main
               located in Blue Wren Place to service each lot within the proposed subdivision
               in accordance with Unitywater and SEQ Standard Drawings.
          d.   Water meters must be located on alternative boundaries to electrical pillars.
          e.   The fire-fighting demand on Unitywater’s water supply system from the
               development must not exceed 15 litres per second.
    39.   Reticulated sewerage must be provided to each lot in the development. This must
          include:
          a.   Ensuring sewer house drains are wholly contained within the Lot they will serve.
          b.   Provision of sewerage infrastructure to within the property boundaries of each
               lot within the proposed subdivision.

                                                                                  Page 64 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.