Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    40.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers
          and proposed building envelopes, buildings and other structures
    41.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
          located within property boundaries in accordance with the SEQ standards.
          Easements shall be centred over the pipe. Easement terms shall be the most current
          registered dealing held by the Department of Natural Resources & Mines and shall
          not be altered or amended.
    42.   Stormwater retention systems and gross pollutant traps must maintain a minimum
          clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure
    43.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
          Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
          Landscaping plants within these clearances must be low growing when mature and
          suitable Unitywater approved varieties.
    44.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
          infrastructure must not adversely affect the integrity of the infrastructure. All costs
          associated with repair, replacement or alteration of infrastructure must be met by the
          applicant.
    ADVISORY NOTES
    The following notes are included for guidance and information purposes only and do not
    form part of the assessment manager conditions:
    Aboriginal Cultural Heritage Act 2003
    1.    There may be a requirement to establish a Cultural Heritage Management Plan
          and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
          Act).
          The ACH Act establishes a cultural heritage duty of care which provides that: “A
          person who carries out an activity must take all reasonable and practicable measures
          to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
          fail to comply with the duty of care. Substantial monetary penalties may apply to
          individuals or corporations breaching this duty of care. Injunctions may also be issued
          by the Land and Resources Tribunal, and the Minister administering the ACH Act can
          also issue stop orders for an activity that is harming or is likely to harm Aboriginal
          cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
          You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
          obligations under the ACH Act.
    Co-ordination of Operational Works Assessment
    2.    Additional application fees apply to Operational Work applications where the different
          aspects of the works are lodged separately. Significant savings in application fees will
          result if all works are lodged in a single application.
    Preparation of a Preliminary Construction Management Plan
    3.    A preliminary Construction Management Plan must be submitted with the Operational
          Works application and must address the following:
          a.   traffic management during all aspects of the construction phase including:
               i.    a Traffic Management Control Plan in accordance with the Manual of
                     Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
                     and traffic control measures prior to construction.
               ii.   maintenance of safe pedestrian access for the areas affected by the
                     works during and after daily construction has ceased.


                                                                                  Page 65 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.