PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
iii. proposed fencing to the site during the construction phase of the
development.
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled
roads.
v. provision for worker car parking.
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be
fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal
Contractor employed to construct the works and a final document will be
required to be submitted at the Pre-Start Meeting for the project.
Property Notes
4. The following property notes shall be placed against the relevant lots advising the
following:
A Rail and Traffic Noise Study has been undertaken for new buildings on this
property. New buildings shall be constructed in accordance with the
conclusions of the study and the Queensland Development Codes (QDC) MP
4.4 – Building in a Transport Corridor (or equivalent codes/guidelines at the
time of building).
No direct vehicular access to Elm Street is permitted.
Development Compliance Inspection
5. Prior to the commencement of the use, please contact Council to arrange a
Development Compliance Inspection.
Unitywater
6. Connection to the Unitywater live water supply and live sewerage system must be
undertaken by Unitywater at the applicant’s cost.
Infrastructure Charges
7. This Development Permit triggers an “Infrastructure Charge Notice” to be issued in
for Council “trunk” infrastructure in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Page 66 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.