Original source · versioned page text
2020-08-20 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 20 AUGUST 2020
approval of the BMP must be obtained prior to sealing of the plan of survey. The BMP
is to be prepared by a suitably qualified and experienced bushfire expert and shall
include the following requirements.
28. At the time of registering the plan of survey, a covenant is to be registered on proposed
Lots 1, 2 and 4 in Council’s favour generally in accordance with the draft covenant.
29. The approved BMP (and the bushfire mitigation measures for implementing the approved
BMP) must be complied with at all times.
30. A fire trail will be established inside the perimeter of the Bushfire Protection Zone as
shown on Figure 4. The design specifications for the fire trail are:
a) minimum formed width of 4m (the access gate from the common property driveway
must also provide this clearance);
b) located inside a 6m wide vegetation clearing with minimum vertical clearance of
4m to overhanging tree branches;
c) surface rating of 6.5 tonnes for rural fire-fighter appliances;
d) all weather surface, e.g. gravel, concrete or bitumen, etc.;
e) 6m wide by 8m deep turnaround bay near the northern end; and
f) established as an access easement that is granted in favour of the Queensland
Fire and Rescue Service and Noosa Shire Council.
Ecological
31. The Applicant is required to prepare a Vegetation Management Plan (VMP). The VMP
is to clearly identify the extent of all development works, and particularly trees to be
retained and removed. The VMP is to be submitted with a development application for
operational work. The VMP must be implemented prior to sealing of the plan of survey.
The VMP is to be prepared by a suitably qualified and experienced ecologist and address
the following:
a) provide arborists advice seeking to minimise the loss of trees in close proximity to
development works;
b) the fire-trail within proposed Lot 1 is to be constructed to minimize tree removal,
and must avoid impacts to eucalypts where possible;
c) a fauna spotter be on site during tree clearing works;
d) any necessary removal of any gums (eucalypts) are to be replaced at a ratio of 3:1
(i.e. replant 3 trees for every 1 removed). This compensatory planting is to be
provided in the western portion of proposed Lot 1 and beyond the fire trail (a
planting plan which identifies planting locations and species is to be prepared);
e) weed management is to be undertaken on the western portion of proposed Lot 1;
f) the natural regeneration of the western part of the site (i.e. outside the bushfire
management area) shall be allowed to occur;
g) any boundary fencing for proposed Lot 1 must be fauna friendly;
h) erosion control measures (standard best practice) to be implemented where
necessary for any earthworks;
i) installation of four nest boxes (e.g. 1 x glider, 1 x possum and 2 x parrot) is required
in trees within the western portion of the site to compensate for the lack of hollows
in the local landscape.
Community Management Statement
32. The community management statement for the proposed development must, at all times,
Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.