NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 16
All other clean stormwater, such as roof water, can be collected on site and discharged through a single
underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor/gross
pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors/gross
pollutant trap, which shall be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
The approved maintenance plan shall be incorporated in the ongoing maintenance scheme for the
development and a copy of this shall be provided for Council’s records prior to commencement of the
approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for Operational
Works has been issued in regard to the drainage scheme.
41. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
42. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
43. The existing sewer main that traverses the site adjacent to the rear boundary and the ‘zone of influence’
(taken as the area within a 45-degree angle measured from the invert of the sewer main to the finished
surface level) shall be accurately located and determined by a licensed Surveyor and shown on all plans
submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, rainwater retention and detention tanks,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of
influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater. As such the
applicant shall amend Operational Works plans including Building plans to ensure compliance.
Town Water Supply
44. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
45. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
46. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
Service Easements (Sewer)
47. A registered easement shall be created over the zone of influence of all sewers within the subject site and
over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
accurately locate all sewer mains and determine the necessary width of the easement, which shall be
shown on any plans submitted for Operational Works / Building Works approval. To this extent the
surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
48. A registered easement shall be created over any stormwater drainage pipes within the site that collect
stormwater from a Council road or convey stormwater from any adjoining property (for example, where
drainage pipes are provided within the site to prevent adjacent properties from additional ponding/flooding
due to the subject site being filled).
49. No building or other structure shall be constructed or encroach over an easement.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8c06eccd\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00000718.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 239 KB (small file)
- File type
No other editions are linked here.