Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2020-08-31 Special Meeting Minutes

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING MINUTES                                                       31 AUGUST 2020


                  rehabilitated, where necessary, to provide a vegetated screen of future
                  development, exclusive of any Council approved infrastructure. All plants
                  must be local native species suitable for the area and the species selection
                  consistent with the naturally occurring species in the area. The landscaping
                  must be reflective of the surrounding natural landscape. The works must
                  be undertaken in accordance with an Operational Works approval.
            45.   No infrastructure is to be installed in the OS3 land area, unless:
                  a.    in accordance with a Council endorsed management plan; or
                  b.    to connect directly into existing stormwater infrastructure, with any
                        disturbance to vegetation in OS3 minimised and rehabilitated in
                        accordance with a Development Permit for Operational Works.
                  Vegetation Preservation
            46.   Existing vegetation on the undeveloped site and in the road reserve where
                  within 10m of public access or public infrastructure must be retained in
                  accordance with an Arborist Report (or part thereof) prepared by a qualified
                  person* and endorsed through an Operational Works approval to manage
                  the risk to the public.
                  *(Refer to Advisory Note)
                  Fauna Management
            47.   Vegetation must only be removed or disturbed in accordance with a Fauna
                  Management Plan for the development prepared by a qualified person* and
                  referenced in a Development Permit for Operational Works. *(Refer to
                  Advisory Note).
            48.   Clearing for the subdivision will occur generally in accordance with clearing
                  plan Ref: 034389.59 dated 13 July 2020 (Extent of Subdivision Clearing),
                  with the exception that vegetation must be retained along the full frontage
                  of lot 23 to Walter Hay Drive apart from the identified driveway access
                  location. All clearing will be subject to an application for operational works.
                  Fencing to Protected Land
            49.   A permanent fence must be constructed along boundary of lot 17 and
                  covenant J, the entire length of the interface of the site with the park reserve
                  at Lot 5 SP222982, Lot 3 SP182845 and the southern aspect of Lot 147
                  NPW889 (at the corner of Eenie Creek Rd and Walter Hay Drive). The
                  fence must be constructed in accordance with an Operational Works
                  approval and must be to the following specifications:
                  a.    1.8 m high chain wire fence.
                  b.    Include single person access gate (minimum opening of 1200mm) in
                        a suitable location generally in the location of the rear of lot 13.
                  c.    Include signage for each lot interface stating the land is a fauna
                        reserve.
                  d.    The fence must be located adjacent to the northern Boundary of
                        Covenant L.
                  Bushfire Management
            50.   The development must be carried out in accordance with Updated Bushfire
                  Management Plan For Undeveloped Areas Of Noosa Civic prepared by
                  The Consultancy Bureau Pty Ltd, dated December 2019, with the following
                  amendments to be included and constructed in accordance with an
                  Operational Works approval:
                                                                                  Page 12 of 15
Log in to download the original file

2020-08-31 Special Meeting Minutes(PDF, 693KB).pdf · 710 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.