Original source · versioned page text
PR102995-10_Minor Change
Our ref: PR102995-10
2.2 Substantially different development criteria
Under Schedule 1 of the Development Assessment Response
rules, a change may be considered to result in
substantially different development if any of the
following apply to the change:
(a) involves a new use; The change does not involve a new use.
(b) results in the application applying to a new parcel of The change does not result in the application applying to a
land; or new parcel of land.
(c) dramatically changes the built form in terms of scale, The proposed change retains the approved allotment
bulk and appearance; or layout, and thus does not result in a dramatic change in
terms of scale, bulk or appearance.
(d) changes the ability of the proposed development to The changes align the approval with subsequent approved
operate as intended; or land uses over the metes and bounds of Proposed Lot
103, allowing the approved allotment layout to service its
ultimate intended use. The proposed change therefore
allows the development to operate as intended.
(e) removes a component that is integral to the operation The proposed change does not remove a component that
of the development; or is integral to the operation of the development. The
change introduces new components which allow the
approved allotment layout to service its ultimate intended
use
(f) significantly impacts on traffic flow and the transport The approved allotment layout is retained, and thus no
network, such as increasing traffic to the site; or additional traffic flow will be introduced. Notably, the
change introduces conditions pertaining to the upgrade of
Gateway Drive, improving the function of the road network.
(g) introduces new impacts or increase the severity of The proposed change does not introduce any new impacts
known impacts; or or increase the severity of known impacts. The change
provides additional conditions to manage anticipated
impacts from future intended approved uses within
Proposed Lot 103.
(h) removes an incentive or offset component that would The proposed change does not remove an incentive or
have balanced a negative impact of the development; offset component that would have balanced a negative
or impact of the development.
(i) impacts on infrastructure provisions. The proposed change does not impact infrastructure
provisions. No additional lots are proposed, and existing
upstream catchment flows will continue to be captured and
directed to a lawful point of discharge.
3 Referral agencies
As determined by Schedule 9 and 10 of the Planning Regulation 2017, the application does not require
referral to the State Assessment and Referral Agency (SARA). No referral agencies were triggered by the
original application, nor as a result of the change to the application.
4 Amendments to the approval
4.1 Approved drawings and documents
The proposed changes pertain only to the conditions of approval. The approved plan within the following
table will remain the approved document.
Plan No. Rev. Plan/Document Name Date
102996-151 A Proposed Subdivision over Lot 101 on SP279285 16 Sept 2020
RPS AAP Consulting Pty Ltd. Registered in Australia No. 97 117 883 173
rpsgroup.com Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original