Council archive · source document
Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 105, section 1. The text section number identifies this passage in the reader.
ii) provide for the safe passage of e) shared parking / bicycle lane;
vehicles, pedestrians, cyclists, f) contra flow bicycle lane; and
and discharge of stormwater g) bus/bicycle lane.
run-off from contributing
catchments and the S7.4 The provision of bicycle lanes at intersections is
preservation of all weather generally in accordance with AUSTROADS Part 14,
access; section 5 and the Manual of Urban Traffic Control
c) kerb and channel— Devices (MUTCD) Part 9.
i) controls vehicle movement by
delineating the carriageway for
all users;
ii) conveys road pavement run-
off to stormwater drainage in a
manner that allows the road to
be trafficable in Q100 ARI local
rainfall events; and
d) verges and footpaths provide—
i) safe access for pedestrians
and cyclists clear of
obstructions;
ii) an access area for vehicles
onto properties;
iii) a corridor allocated for
services and utilities; and
iv) additional amenity for minor
roads.
O8 Stormwater drainage infrastructure is S8.1 Stormwater drainage planning, design and Complies.
planned, designed and constructed to— construction is in accordance with Section 4 of PSP5
a) be accessible, cost effective and easily Engineering Design Standards – Roads, Drainage and As shown on the Engineering Plans, included within Appendix D of this
maintainable; Earthworks; report, stormwater drainage infrastructure on the subject site has been
b) protect downstream capacity; AND planned and designed to ensure all stormwater is collected and
c) protect downstream water quality; S8.2 As Constructed data is submitted in accordance appropriately managed prior to being discharged from the subject site.
d) maximise on-site stormwater retention with Section 6 of PSP5 Engineering Design Standards – In particular, this is achieved through the installation of a 10,000L
and retardation; and Roads, Drainage and Earthworks; retention tank and a bio-retention drain.
e) convey run-off to stormwater drainage in AND
a manner that allows roads to be trafficable S8.3 Stormwater drainage planning, design and
in Q100 ARI local rainfall events. construction is in accordance with the Queensland
Urban Drainage Design Manual.
O9 Roads and stormwater drainage S9.1 Roads and stormwater drainage infrastructure is Complies.
infrastructure is constructed— constructed in accordance with—
a) in accordance with appropriate a) Sections 2, 3 and 4 of PSP5 Engineering Design All stormwater drainage infrastructure will be constructed in accordance
engineering standards; and Standards – Roads, Drainage and Earthworks; with relevant standards.
b) to minimise adverse environmental b) Queensland Design Code for Residential Streets;
impacts, including from run-off and c) AUSTROADS; or The design of the stormwater drainage infrastructure will ensure no
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.