Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 106, section 1. The text section number identifies this passage in the reader.

     erosion.                                     d) A combination of the principles in these documents;     adverse environmental impacts occur.

                                                  AND                                                        For details regarding the proposed erosion and sediment control
                                                                                                             measures to be implemented during the construction phase please refer
                                                  S9.2 Erosion and sediment control measures are             to the Engineering Plans, included within Appendix D of this report.
                                                  designed and implemented in accordance with the
                                                  Institution of Engineers Australia (Queensland Division)
                                                  Soil Erosion and Sediment Control - Guidelines for
                                                  Queensland Construction Sites.

Environmental Protection                          S10.1 Roads and stormwater drainage follow the edge        Complies.
O10 Roads and stormwater drainage                 of existing disturbed areas or alternatively, these
infrastructure are located and aligned so as      works are co-located within a combined utility corridor;   All stormwater runoff from the subject site will drain to either the
to—                                               AND                                                        10,000L retention tank or the bio-retention basin. Both the retention
a) minimise disturbance to native vegetation      S10.2 Roads avoid native vegetation and provide for        tank and bio-retention basin will be connected to Council’s stormwater
and/or other habitat areas;                       fauna underpasses and associated fencing where             infrastructure. The proposed stormwater management design will
b) protect and maintain wildlife corridor         appropriate;                                               ensure stormwater runoff from the subject site does not have any
movements and the safety of native fauna;         AND                                                        impacts external to the subject site.
c) minimise changes to the hydrological           S10.3 Road infrastructure within or adjacent to native
regime, including drainage patterns, run-off      habitat incorporates fences which allow for protected
and water quality;                                wildlife movement and controls unrestricted access of
d) avoid crossing watercourses, drainage          domestic cats and dogs;
lines and wetlands, but where such crossings      AND
are unavoidable, disturbed areas are              S10.4 Native vegetation is protected from clearing or
reinstated and revegetated on completion of       construction activities by—
works; and                                        a) clearly marking vegetation to be retained with
e) minimise bulk earthworks.                      flagging tap;
                                                  b) installing protective fencing around the dripline of
                                                  vegetation; and
                                                  c) ensuring stock piling, storage and vehicle parking
                                                  occur outside the areas of vegetation to be retained;
                                                  AND
                                                  S10.5 Low impact construction techniques are used
                                                  around areas of vegetation to be retained to minimise
                                                  interference with the vegetation.

O11 Roads and stormwater drainage                 No solution provided                                       Not applicable.
infrastructure is proven to be suitable for its
use prior to Council accepting the dedicated                                                                 The only stormwater infrastructure proposed is private stormwater
asset.                                                                                                       infrastructure to be connected to Council’s stormwater main. No
                                                                                                             stormwater infrastructure to be dedicated to Council is proposed.


O12 Alignment of stormwater drainage              S12.1 The location, design and construction of             Not applicable.
infrastructure is to allow for easy access for    stormwater drainage structures is in accordance with
the ongoing maintenance by Council.               Sections 4 and 5 of PSP5, Engineering Design               The only stormwater infrastructure proposed is private stormwater

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.