Council archive · source document
Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 112, section 1. The text section number identifies this passage in the reader.
Application for a Development Permit for Material Change of Use to establish an Industrial Business, Type 1 Warehouse and Retail Business, Type 4 Showroom (Trade Related Showroom, Plumbing Supplies) and Operational Works (Stormwater Drainage, Landscaping, Car Parking and Access Driveway), on land identified as Lot 10 on SP230643, situated at 10/100 Rene Street, Noosaville Qld 4566 WATER SENSITIVE DESIGN CODE Specific Outcomes Probable Solutions How does the proposal comply with the Overall Outcome/s or Specific Outcome/s? Water reuse Complies. O1 Development uses a combination of S1.1 Development complies with the water quality detention and retention systems to capture standards in Table 2 of the SEQ Regional Plan As shown on the Engineering Plans contained within Appendix D of run-off from areas on the site; Implementation Guideline No. 7 for Water Sensitive this report, the proposed development will have: AND Urban Design; − a 10,000L retention tank in the north-west corner of the subject site; and O2 Water storage devices must have S2.1 No solution provided − a bio-retention basin along the northern boundary of the subject sufficient capacity having regard to local site. rainfall pattern and the catchment area of roof or other hard standing surface; AND O3 Captured water is utilised for all non- S3.1 Captured water is plumbed to be available for potable uses on site; all external uses including gardening, irrigation, ponds, filling swimming pools and outdoor cleaning, AND as well as all ground floor toilet cisterns and washing machine cold taps; O4 On-site detention does not adversely impact on water requirements downstream AND of the site where the water is required to S3.2 Where the captured water is used for toilet sustain the ecology and hydrology of flushing and/or laundry use, an automatic or manual downstream systems (environmental flows); interchange device that allows alternate use of AND captured water or the reticulated water supply is installed to ensure that there is a continual supply of O5 Within the Shire Business Centre site, as water for sanitary flushing and laundry use. shown on Map SBC, on-site detention measures are contained within the developed S4.1 No solution provided areas of the site, clear of drainage lines and Open Space Precincts. S5.1 No solution provided Run-off treatment Complies. O6 Run-off that leaves the site is treated so S6.1 & S7.1 Development complies with the water
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.