Skip to the record
The gold standard in government transparency.

Council archive · source document

Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 113, section 1. The text section number identifies this passage in the reader.

as not to adversely impact on the ecology         quality standards in Table 2 of the SEQ Regional     Stormwater runoff from the subject site will pass through the bio-
and hydrology of downstream environmental         Plan Implementation Guideline No. 7 for Water        retention basin.
flows;                                            Sensitive Urban Design.
AND                                                                                                    The proposed bin storage area will be bunded to ensure no
                                                                                                       contaminants come in contact with any stormwater.
O7 Within the Shire Business Centre site, as
shown on Map SBC—
a) run-off treatment occurs within the site ;
and
b) drainage lines are only used for final
polishing of run-off.



Town water supply connections                     S8.1 A suitable backflow prevention device is        Not applicable.
O8 Backflow devices or similar systems            installed to protect the potable water within the
ensure water reuse facilities have no impact      reticulated water supply in accordance with AS/NZS   No stormwater collected on the subject site will backflow into
on the quality of the town mains water.           3500:2003 Plumbing and Drainage.                     Council’s water mains.



Use of natural treatments and systems                                                                  Complies.
O9 Natural treatment strategies, including        S9.1 & S10.1 Development complies with the water
grass swales and bio-retention systems,           quality standards in Table 2 of the SEQ Regional     A bio-retention basin is proposed along the northern boundary of the
vegetated filtration strips and gross pollutant   Plan Implementation Guideline No. 7 for Water        subject site.
traps, are used wherever practicable;             Sensitive Urban Design.
AND                                                                                                    For further details regarding the design of the bio-retention basin,
O10 Within the Shire Business Centre, as                                                               please refer to the Engineering Plans contained within Appendix D of
shown on Map SBC— where necessary,                                                                     this report.
drainage lines are ecologically enhanced to
ensure that the water quality polishing
functions are of high standard.

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.