Council archive · source document
Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 114, section 1. The text section number identifies this passage in the reader.
Application for a Development Permit for Material Change of Use to establish an Industrial Business, Type 1 Warehouse and Retail Business, Type 4 Showroom (Trade Related Showroom, Plumbing Supplies) and Operational Works (Stormwater Drainage, Landscaping, Car Parking and Access Driveway), on land identified as Lot 10 on SP230643, situated at 10/100 Rene Street, Noosaville Qld 4566 WATER SUPPLY AND SEWERAGE RETICULATION CODE Specific Outcomes Probable Solutions How does the proposal comply with the Overall Outcome/s or Specific Outcome/s? 14.164 Design and Construction (water) O1 Water supply infrastructure— Not applicable. a) meets the needs of the users; S1.1 Water supply infrastructure is designed in b) is designed to be compatible with existing accordance with PSP6 – Engineering Design No extension of Council’s water infrastructure is required for the infrastructure; and Standards — Water and Sewerage and As proposed development. c) is designed using materials that are Constructed data submitted in accordance with PSP6 suitable for the use, durable, easy to – Engineering Design Standards — Water and maintain and cost effective, taking into Sewerage. account the whole of life cycle cost and Council’s maintenance inventory. O2 Water supply infrastructure is Not applicable. constructed— S2.1 Water supply infrastructure is constructed in a) in accordance with appropriate accordance with PSP6 – Engineering Design No extension of Council’s water infrastructure is required for the engineering standards; and Standards — Water and Sewerage; proposed development. b) to minimise adverse environmental AND impacts. S2.2 Erosion and sediment control measures are designed and implemented in accordance with the Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control - Guidelines for Queensland Construction Sites. O3 Water supply infrastructure is proven to No solution provided. Not applicable. be suitable for its use prior to Council accepting the dedicated asset. No extension of Council’s water infrastructure is required for the proposed development. O4 Water supply infrastructure is provided No solution provided. Not applicable. with all supporting technical documentation. No extension of Council’s water infrastructure is required for the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.