Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
• Lot 7 (North) Catchment Tank Outlet:
o Low-flow outlet: 90mm diameter orifice with invert at RL 6.50m;
o Mid-flow outlet: 150mm diameter orifice with invert at RL 7.75m; and
o High-flow weir: 2m long weir with crest height at RL 8.0m.
• Lot 7 (South) Catchment Tank Outlet:
o Low-flow outlet: 100mm diameter orifice with invert at RL 6.50m;
o Mid-flow outlet: 150mm diameter orifice with invert at RL 7.60m; and
o High-flow weir: 2m long weir with crest height at RL 8.00m
See Engineering Drawings in Appendix B for further information.
4.2.7 Results for Developed Scenario
Tables 18, 19 and 20 indicates the developed total peak discharge rate from the development sites as outputted by XP
storm. The peak flow rate indicated is the combined flow of the site and external catchments. To determine the critical
storm event for the developed mitigated case, the 1-to-100-year ARI storm events for 20, 25, 30, 45, 60, 90, 120 and 180-
minute durations were simulated in the model.
From these simulations it was determined that the critical storm event for the Lot 3 Catchment was the 180-minute storm
for all storm event ARIs, and for the two Lot 7 catchment, the critical storm event varied between the 45-minute storm and
the 180-minute storm depending on the storm event ARI. The critical storm event results will therefore be compared
against the existing scenario discharges for both catchments, as identified in Section 4.2.8.
Further details of the outputs for the critical events have been located within Appendix F.
Table 18: XP Storm Developed Mitigated Peak Flow Results – Lot 3 (m3/sec)
Storm Duration ARI (Years)
(min) 1 2 5 10 20 50 100
20 0.037 0.042 0.051 0.068 0.104 0.143 0.170
25 0.041 0.045 0.061 0.099 0.137 0.174 0.193
30 0.044 0.048 0.080 0.126 0.163 0.191 0.217
45 0.049 0.055 0.132 0.179 0.203 0.280 0.337
60 0.054 0.077 0.163 0.210 0.259 0.343 0.409
90 0.075 0.107 0.194 0.270 0.338 0.419 0.563
120 0.090 0.122 0.206 0.318 0.357 0.462 0.626
180 0.102 0.132 0.220 0.327 0.373 0.481 0.628
Critical 0.102 0.132 0.220 0.327 0.373 0.481 0.628
Critical Event 180 180 180 180 180 180 180
www.bornhorstward.com.au Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.