Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

            •    Lot 7 (North) Catchment Tank Outlet:
                      o     Low-flow outlet: 90mm diameter orifice with invert at RL 6.50m;
                      o     Mid-flow outlet: 150mm diameter orifice with invert at RL 7.75m; and
                      o     High-flow weir: 2m long weir with crest height at RL 8.0m.


            •    Lot 7 (South) Catchment Tank Outlet:
                      o     Low-flow outlet: 100mm diameter orifice with invert at RL 6.50m;
                      o     Mid-flow outlet: 150mm diameter orifice with invert at RL 7.60m; and
                      o     High-flow weir: 2m long weir with crest height at RL 8.00m


        See Engineering Drawings in Appendix B for further information.


4.2.7   Results for Developed Scenario


        Tables 18, 19 and 20 indicates the developed total peak discharge rate from the development sites as outputted by XP
        storm. The peak flow rate indicated is the combined flow of the site and external catchments. To determine the critical
        storm event for the developed mitigated case, the 1-to-100-year ARI storm events for 20, 25, 30, 45, 60, 90, 120 and 180-
        minute durations were simulated in the model.


        From these simulations it was determined that the critical storm event for the Lot 3 Catchment was the 180-minute storm
        for all storm event ARIs, and for the two Lot 7 catchment, the critical storm event varied between the 45-minute storm and
        the 180-minute storm depending on the storm event ARI. The critical storm event results will therefore be compared
        against the existing scenario discharges for both catchments, as identified in Section 4.2.8.


        Further details of the outputs for the critical events have been located within Appendix F.


                                Table 18: XP Storm Developed Mitigated Peak Flow Results – Lot 3 (m3/sec)
                          Storm Duration                                    ARI (Years)
                                 (min)           1        2        5         10           20        50     100
                          20                   0.037     0.042   0.051     0.068         0.104     0.143   0.170
                          25                   0.041     0.045   0.061     0.099         0.137     0.174   0.193
                          30                   0.044     0.048   0.080     0.126         0.163     0.191   0.217
                          45                   0.049     0.055   0.132     0.179         0.203     0.280   0.337
                          60                   0.054     0.077   0.163     0.210         0.259     0.343   0.409
                          90                   0.075     0.107   0.194     0.270         0.338     0.419   0.563
                          120                  0.090     0.122   0.206     0.318         0.357     0.462   0.626
                          180                  0.102     0.132   0.220     0.327         0.373     0.481   0.628
                          Critical             0.102     0.132   0.220     0.327         0.373     0.481   0.628
                          Critical Event        180      180      180       180          180       180     180




                                                       www.bornhorstward.com.au                                           Page 13

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.