Appendix 1 - DA Permit 04-0429 Approval

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




               Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 11
                     Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should
                     the headworks contributions not be paid at the due time, Council shall call upon the
                     trading bank guarantee in full.

                     In the event that the Development Permit for Material Change of Use of Premises lapses
                     or is cancelled, the contribution or trading bank guarantee will be returned.

               Erosion and Sediment Control

               27.   Any person acting on this permit shall prevent erosion and sediment export from
                     leaving the site. Site control measures such as silt fencing, controlled gravel access to
                     the site and controlled disposal of waste, will be necessary.

               28.   In this regard plans detailing the methods of controlling erosion and sediment are
                     required to be submitted to the Council for approval prior to obtaining a Development
                     Permit for Operational Works.

               General

               29.   Any damage caused to any public utility during the course of construction shall be
                     repaired to Council’s standards and at no cost to Council.

               30.   Any alteration of any public utility or other facilities necessitated by the development of
                     the land or associated construction works external to the site shall be at no cost to
                     Council.

               31.   The transportation of all materials to and from the site shall be undertaken in a manner
                     such that no particle matter escapes onto a public road. All vehicles carrying materials
                     either to or from the site shall be covered to prevent materials including dust being
                     windblown from the vehicle.

               Building Services

               32.   A contour survey of the subject site is to be carried out by a Licensed Surveyor and is to
                     be submitted to Council at the time of application for building approval. Such survey
                     shall set out the natural surface levels of the site and the position of buildings on the
                     site.

               33.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
                     certificate lodged with Council at completion of the work confirming compliance with
                     the maximum building height above natural surface, required by the provisions of the
                     Planning Scheme.

               Environmental Health

               34.   The developer must provide a suitably screened imperviously paved area large enough
                     for all refuse and recycling containers.




                                                                                                   Print Date: 15 July 2020, 2:02 PM
Log in to download the original file

Appendix 1 - DA Permit 04-0429 Approval.pdf · 706 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.