Appendix 1 - DA Permit 04-0429 Approval
Noosa Council documents
Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 11
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should
the headworks contributions not be paid at the due time, Council shall call upon the
trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the contribution or trading bank guarantee will be returned.
Erosion and Sediment Control
27. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access to
the site and controlled disposal of waste, will be necessary.
28. In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
General
29. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
30. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
31. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
Building Services
32. A contour survey of the subject site is to be carried out by a Licensed Surveyor and is to
be submitted to Council at the time of application for building approval. Such survey
shall set out the natural surface levels of the site and the position of buildings on the
site.
33. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with
the maximum building height above natural surface, required by the provisions of the
Planning Scheme.
Environmental Health
34. The developer must provide a suitably screened imperviously paved area large enough
for all refuse and recycling containers.