PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
59. A suitably qualified person* is a Registered Professional Engineer of Queensland
with experience and knowledge in the design and operation of the storage and
dispensing of petroleum products.
Environmental Protection – General Environmental Duty S319
60. A copy of this decision notice must be kept on site in a location readily accessible to
personnel carrying out this activity.
61. Notwithstanding any other condition of this decision notice, this notice does not
authorize any release of contaminants that cause or is likely to cause an
environmental nuisance beyond the boundary of the property.
Decommissioning of Underground Petroleum Storage Systems (UPSS)
62. All UPSS shall be decommissioned in accordance with AS 4976-2008 The Removal
and Disposal of Underground Petroleum Storage Tanks.
63. Certification must be provided to Council confirming the UPSS decommissioning was
conducted by a suitably qualified and experience person, and that removal,
transportation and disposal was in accordance with the Standards and legislation.
64. At the time of decommissioning of any UPSS the site must be investigated for
contamination. An Assessment report must be prepared by a suitably qualified and
experienced person (as required under the Environmental Protection Act 1994) to
verify the site has either met remediation criteria or is suitable for continued and
future use. The assessment report must be submitted to Council no later than 60
days of either:
a. Decommissioning of an UPSS if no soil or ground water remediation is
required.
b. Completion of any remediation associated with the decommissioning of an
UPSS if remediation is required.
65. All records associated with the decommissioning of UPSS must be maintained for a
period of 7 years after removal of UPSS. These records must be provided to future
owners/operators of the service station and property, as part of ensuring all
practicable measures have been implemented to prevent site contamination.
66. As articulated in Section 2.6 soil sampling of the opened pits and trenches to check
for any hydrocarbon contamination must be carried out. If decontamination work is
required then the requirements of the Environmental Protection Act 1994 must be
followed for site remediation. An assessment report must be submitted to Council.
Underground tanks
67. Prior to the commencement of the use underground tanks shall be constructed and
installed in accordance with the following:
a. Tanks are to be made of fibre-reinforced thermosetting resin (fibreglass) that is
compatible with the product or tanks are to be made of a steel inner wall and a
fibre-reinforced thermosetting resin composite (fibreglass) outer wall.
b. Tanks are to be double-walled with an interstitial space.
c. Tanks are to meet the requirements of UL 1316 Glass fibre reinforced
underground storage tanks for petroleum products, alcohols and alcohol
gasoline mixtures, or the equivalent or tanks are to meet the requirements of
AS1692-2006 Steel tanks for flammable and combustible liquids, or the
equivalent.
d. Tanks are to have an overfill protection valve installed in the drop tube of the
tank. The overfill prevention valve shall be calibrated to prevent the tank from
being filled in excess of 90% of its capacity.
Page 30 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.