PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
Submit certification
68. Prior to the commencement of the use certification by a suitably qualified person that
the underground tanks have been constructed and installed in accordance with the
above requirements must be submitted to Council.
Pipework
69. Prior to the commencement of the use pipework shall be constructed and installed in
compliance/accordance with the following:
a. Pipework is to be made of non-corrodible materials as defined by cl 1.4.37 AS
4897. The design, installation and operation of underground petroleum storage
systems.
b. Product piping is to be double-walled with an interstitial space.
c. Each tank fill point is to be clearly labelled and identified in accordance with AS
4977 Petroleum products - Pipeline, road tanker compartment and underground
tank identification.
d. Each tank fill point is to be fitted with a camlock type or other liquid-tight
connection.
e. Each tank fill point is to be provided with spill containment of at least 15 litre
capacity per spill point.
f. All fill and vapour recovery points are to be earthed in accordance with AS
1020.0 The control of undesirable static electricity and AS 3000 Electrical
installations.
Submit certification
70. Prior to the commencement of the use certification by a suitably qualified person that
the pipework has been constructed and installed in accordance with the above
requirements must be submitted to Council.
Leak detection for underground tanks
71. Prior to the commencement of the use underground petroleum storage tanks shall be
monitored for leaks in accordance with the following:
a. Establish a statistical inventory analysis system that is rated to detect a release
of 0.76 litres/hour (or a release of 18 L/day), with greater than 95% confidence
(and less than 5% false positive) or install automatic tank gauging that is rated
to detect a release of 0.76 litres/hour (or a release of 18 L/day), with greater
than 95% confidence (and less than 5% false positive).
b. Install a tank pit observation well at the lowest point of each tank excavation pit.
Submit certification
72. Prior to the commencement of the use certification from a suitably qualified person
that the leak detection system was installed and was verified as meeting the above
leak detection performance standard using the current United States Environmental
Protection Agency (USEPA) protocol must be submitted to Council.
Leak detection for pipework
73. Prior to the commencement of the use product pipework shall be monitored for leaks
in accordance with the following:
a. Install electronic line leak detection for pressure piping that is rated to detect a
release of 0.76 litres/hour (or a release of 18 L/day), with greater than 95%
confidence (and less than 5% false positive); or
Page 31 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.