Original source · versioned page text
Pensasr Project Construction Management Plan
Plans and drawings: the text below has words only, no drawings.
Project Management Plan Table of Contents Project Management Plan Review Process 3 1. Introduction 4 1.1 Purpose of this Document 4 1.2 Notes on Format of this Document 4 1.3 Folder Structure: Site Office 4 2. Project Scope and Objectives 6 2.1 In Scope 6 2.2 Out of Scope 6 2.3 Project Objectives 6 2.4 Project Specific Constraints 6 3. Project Organisation and Construction Program 7 3.1 Project Organisation 7 3.2 Construction Program 7 4. Suppliers and Sub-Contractors 7 4.1 Suppliers List 7 4.2 Sub-Contractors Agreements 7 4.3 Orders & Associated Detail 8 5. Project Documents (Folders) 8 5.1 Drawings & Drawing Register 8 5.2 Specifications 8 5.3 Schedule of Quantities 8 5.4 Daily Job Costing 8 5.5 Site Communication 9 5.6 Client Correspondence 9 5.7 Sub-Contractor Correspondence 9 5.8 Variations – Register & Correspondence 9 5.9 RFIs – Register & Correspondence 9 5.10 Extension of Time - Register & Correspondence 9 5.11 Other “Confidential/Company papers” 9 6. IMS Requirements 9 6.1 Risk Assessment – Procedure & Records 9 6.2 Work Procedures 10 6.3 Hazardous Materials & Dangerous Goods Register 10 7. Traffic Management Folder 10 8. “Other Matters” Folder 10 8.1 Forms 10 Document Control (for template) 11 Project Management Plan (GRP-PLN-001-PROJECT NUMBER) January 2019, Rev: 5 215 David Low Way, Peregian Beach/ G20-010 Page 2 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original