Pensasr Project Construction Management Plan

Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach (EMAIL 3/3) - Fauna Management, Landscaping, Bushfire Management, Environmental Management, Waste & Preliminary Construction Management Plan.

of 11

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                Project Management Plan

Project Management Plan Review Process
    The Project Management Plan (PMP) must be reviewed after any:

    •   Changes to the scope of works
    •   Changes to the design that create additional safety risks;
    •   Changes to relevant legislation, Codes of Practice or industry standards;
    •   Changes to the Clients safety systems;
    •   Safety alerts from external bodies that are relevant to the scope of works;
   • Incidents, not limited to the project, where internal system changes are implemented;
The PMP must be reviewed monthly as a minimum even if no changes have occurred.
Any additional risks must be documented on the Project Risk Assessment (WHS-RA-003).
The Project Manager (PM) is responsible for ensuring that any changes to the PMP are communicated to
the members of the Project Management Team and relevant workers and subcontractors.


 PMP REVIEW
                                                                         Changes Reviewed

                                                                     Project    Relevant
  Rev                                         Changes made (if        Mgt.      workers
           Date      Reason for Review                                                         By       Status
   #                                            applicable)          Team       and sub-
                                                                               contractor     whom

                                                                     Y / N      Y / N
    A      25/11/    Initial Draft – Issued   Nil – Initial Draft      Y          N/A           RV      Closed
            2019           for Review




 Project Management Plan (GRP-PLN-001-PROJECT NUMBER)                                       January 2019, Rev: 5
 215 David Low Way, Peregian Beach/ G20-010                                                       Page 3 of 11
Log in to download the original file

Pensasr Project Construction Management Plan.pdf · 373 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.