Pensasr Project Construction Management Plan
Plans and drawings: the text below has words only, no drawings.
Project Management Plan
Project Management Plan Review Process
The Project Management Plan (PMP) must be reviewed after any:
• Changes to the scope of works
• Changes to the design that create additional safety risks;
• Changes to relevant legislation, Codes of Practice or industry standards;
• Changes to the Clients safety systems;
• Safety alerts from external bodies that are relevant to the scope of works;
• Incidents, not limited to the project, where internal system changes are implemented;
The PMP must be reviewed monthly as a minimum even if no changes have occurred.
Any additional risks must be documented on the Project Risk Assessment (WHS-RA-003).
The Project Manager (PM) is responsible for ensuring that any changes to the PMP are communicated to
the members of the Project Management Team and relevant workers and subcontractors.
PMP REVIEW
Changes Reviewed
Project Relevant
Rev Changes made (if Mgt. workers
Date Reason for Review By Status
# applicable) Team and sub-
contractor whom
Y / N Y / N
A 25/11/ Initial Draft – Issued Nil – Initial Draft Y N/A RV Closed
2019 for Review
Project Management Plan (GRP-PLN-001-PROJECT NUMBER) January 2019, Rev: 5
215 David Low Way, Peregian Beach/ G20-010 Page 3 of 11