Pensasr Project Construction Management Plan

Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach (EMAIL 3/3) - Fauna Management, Landscaping, Bushfire Management, Environmental Management, Waste & Preliminary Construction Management Plan.

of 11

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                               Project Management Plan

Risk Assessments and Service Histories (provided by the operator)
Folder 4: Pensar SWMS
Stored here and electronically on the project drive, accessed via the following link:
Z:\Shared\Resources and Regional (R)\01. Jobs - Regional\FY 2019-2020\G20-020 215 David Low
Way Peregian Beach\09. Safety\05. SWMS
Folder 5: Sub-Contractor SWMS – Ensure all SWMS have a completed checklist attached:
    •   Subcontractor SWMS Checklist (WHS-FRM-012)
Folder 6: Daily/Weekly Forms (Pre-Starts/Weekly Site Safety & Environment Inspection/Supervisor’s
Sheet)
    •   Weekly Site Safety & Environment Checklists (WHS-FRM-013),
    •   Daily Supervisor’s Sheet (GRP-FRM-002)
    •   Daily Pre-Start Meeting (WHS-FRM-020)

Folder 7: Permits (Permit Register, Current and Closed Permits)
Permits (Link to Permits on Server) together with associated Dial Before You Dig details, underground
services data and copies of reports on any sub-surface investigations are stored in Folder 7.
Folder 8: Quality (ITPs, Check Sheets, Inspections, Audit Reports, Incidents /Hazards etc)
Include here copies of reports for all incidents that have occurred on or associated with this project; where
warranted, an Incident Register is also to be included here to facilitate review and close-out of Incident
Reports. Depending on the size of the project, this may be stored at Head Office
    •   Incident Reports (WHS-FRM-027)
    •   Hazard / Near Miss Report (WHS-FRM-029A)
Stored in Folder 8 and/or electronically on the project drive, accessed via the following link:
Z:\Shared\Resources and Regional (R)\01. Jobs - Regional\FY 2019-2020\G20-020 215 David Low
Way Peregian Beach\10. Quality AssuranceFolder 9: Minutes (Meetings – Project Team/Client etc)
    •   Toolbox meeting minutes (WHS-FRM-014)
    •   Project Team Site Meetings (GRP-FRM-005)

Stored in Folder 9 and/or electronically on the project drive, accessed via the following link:
Z:\Shared\Resources and Regional (R)\01. Jobs - Regional\FY 2019-2020\G20-020 215 David Low
Way Peregian Beach\09. Safety
Folder 10: Other
Any documentation that needs to be stored which has not been listed above.
Link to folder labels template in “O” Drive: Folder Labels




 Project Management Plan (GRP-PLN-001-PROJECT NUMBER)                                    January 2019, Rev: 5
 215 David Low Way, Peregian Beach/ G20-010                                                       Page 5 of 11
Log in to download the original file

Pensasr Project Construction Management Plan.pdf · 373 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.