Pensasr Project Construction Management Plan
Plans and drawings: the text below has words only, no drawings.
Project Management Plan 2. Project Scope and Objectives 2.1 In Scope This defines the project boundaries to facilitate effective management of deliverables on time and to agreed/approved cost. The scope of works for 215 David Low Way, Peregian Beach, includes all design related aspects from initial conception to issuing of for construction plans, production of as constructed documentation and final submission to Council (including plan sealing and cadastral survey set out and registering of properties). In summary the design aspects includes; • Full Civil Construction design (bulk earthworks stormwater, sewerage, water reticulation, roadway, etc.) • Electrical Design including conduit alignment, pit locations, cabling details, location of pad mount transformers, property connections any additional electrical fixtures; In relation to the construction works, the scope of works defined within the For Construction plans will generally entail the following items; • Stripping of Topsoil; • Bulk Earthworks (approximately of imported 12,000m3 earthworks); • All drainage installation including inter-alotment drainage to the legal point of discharge; • Construction of gravity sewerage reticulation to the existing sewerage network; • All electrical reticulation installation to service including pits, pipe, cabling, jointing and any other items required within the electrical design; • Construction of water reticulation network • Preparation of subgrade and placement of gravel within the newely defined roadway, potential construction of concrete roadways to be reviewed • All quality assurance testing of the aforementioned items to the minimum requirements of the relevant local authority (i.e. Noosa Shire Council, Unitywater, Energex, etc.) will form part of the scope works. 2.2 Out of Scope The following items are considered to be out of scope for Pensar/ this document: • Building works and any allotment construction works unless noted within the Civil Design • Concrete roadways and subgrade preparation are considered out of scope at this stage • Any other items discussed to be excluded during the tender review process 2.3 Project Objectives Include here a statement of what the project is expected to achieve including potential benefits based upon the current state of knowledge and understanding, e.g.: • Construction of a specific stage of a high standard subdivision. • Meet client expectations and time targets. • Close co-operation with other parties operating in the vicinity of the site. • Develop close relationships with all stakeholders (e.g. neighbouring property owners). 2.4 Project Specific Constraints The project objectives for 215 David Low Way located at Peregian Beach include the following; Project Management Plan (GRP-PLN-001-PROJECT NUMBER) January 2019, Rev: 5 215 David Low Way, Peregian Beach/ G20-010 Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original