Original source · versioned page text
Meeting papers
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 7.3
Activation Criteria The disaster management system at a local level, involving
the LDMG, may be activated for any number of reasons. The
following decision criteria should be employed (if yes is answered
to any of the following the LDMG should be activated):
• Is there a perceived need relative to an impending hazard
impact which requires multi-agency coordination?
• Has there been a request from a response agency, to provide
resource support and coordination in support of operations?
• Has there has been a request / direction from the DDC to
activate the LDMG?
• Has there been a sudden impact event which requires
involvement of the LDMG in one or more phases of PPRR?
Noosa Council | 2023 Local Disaster Management Plan 77
Page 143 of 192
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.