Original source · versioned page text
Geotech Report - Acid Sulfate Soil Assessment - Appendix A
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
= nian as ae re PARTNERS Residential Development 215-219 David Low Way, Peregian Beach Draft Acid Sulfate Soil Management Plan (ASSMP) Element Acid Sulfate Soil Management Plan Objective/Target The objective of the ASSMP is to control net acidity levels within soils disturbed during site development works, and to restrict to an acceptable level any potential on-site and off-site environmental impacts during site redevelopment. ASS Management To mitigate and manage potential environmental impacts associated with ASS during the Strategy redevelopment works. This will be achieved by having a materials handling and management strategy in place, as well as procedures for either on-site lime treatment of soils or, the appropriate off-site treatment of soils (if a suitably sized and appropriately located space is not available for on-site treatment). Tasks/Actions An ASS investigation has been carried out to assess the soils within the redevelopment site, to a maximum depth of 2.5m below the existing surface level. Fill materials, sands and silty sands have been shown to contain negligible levels of net acidity and do not require treatment for ASS. However, the natural dark grey-brown, silty clays encountered in Bores 1 and 2 have been shown (in Bore 2) to contain levels of net acidity that exceed the State Planning Policy 2/02 Action, Criteria of 0.03 %S. The natural silty clays will therefore require treatment as follows: © |fon-site treatment is undertaken then lime treatment of the soils will be undertaken as described below. e Where on-site treatment is not possible the silty clays will be excavated, then transported in a sealed truck to an appropriately designed off-site treatment area for neutralisation. ASS Treatment On-Site e Any silty clays exposed in the base of the basement excavation will require an application of ag-lime at a rate of 5 kg/square metre. e Where excavated silty clay soils are to be treated on-site, a suitably sized dedicated treatment area will be created. Soils to be treated shall be placed on the treatment area in layers not thicker than 0.3m. e Bunding will be constructed around the perimeter of the designated treatment area to intercept and contain run-off from the area during the soil treatment operations. e The base of the treatment area is to be lime treated prior to placement of each layer of excavated material. Re-treatment with ag-lime is required prior to placement of each new layer of excavated material to be treated, and at the conclusion of all treatment. The base of the treatment pad shall have a minimum ag-lime application of 5 kg/square metre. e Ag-lime will be applied evenly over the surface of the treatment area and thoroughly blended into the ASS at a rate of 3 kg of ag-lime/tonne of dry silty clay soil. This liming rate is based on a factor of safety of 1.5 and the use of good quality fine ag- lime with a neutralising value of not less than 80 %. e When incorporation of the lime is complete, chromium suite validation testing of the treated spoil will be carried out to establish that sufficient ag-lime has been added to neutralise the acid generation potential of the spoil. Where validation testing fails to meet performance indicators, application of additional ag-lime will be required until a satisfactory net acidity validation result has been achieved. e Once ag-lime treatment is complete, the treated spoil may then be stockpiled for later use or off-site disposal (as appropriate). © Should the proposed depth of disturbance extend below 2.5m in depth from surface level, then additional ASS testing will be required. e Lime-treated, stockpiled soil shall have sediment fences and/or hay bales placed downslope to intercept any eroded material. Earthen bunds shall be constructed downslope of stockpile areas to divert run-offfdrainage to a collection sump. The water quality of the sump is to be monitored against the water quality objective Residential Development Appendix C 215-219 David Low Way, Peregian Beach Page 1 of 3 Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.