Geotech Report - Acid Sulfate Soil Assessment - Appendix A
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Residential Development 215-219 David Low Way, Peregian Beach Draft Acid Sulfate Soil Management Plan (ASSMP) Element Acid Sulfate Soil Management Plan Tasks/Actions (cont'd) criteria for a tidal estuary. ASS Treatment Off-Site Where soils are required to be treated off-site, treatment of the soils will be undertaken either: in accordance with the provisions of this ASSMP for on-site treatment, modified as necessary for use at an accessible alternative off-site treatment area; or e in accordance with the ASSMP for the designated off-site treatment area. Performance Indicators Retained Water Laboratory testing of the water encountered during basement excavation will be carried out for pH, dissolved oxygen and turbidity. These parameters will be assessed against the equivalent water quality objective criteria for a tidal estuary as follows: pH 6.5-8.5 Disturbed Oxygen 80-100% saturation Turbidity 20NTU Treated Soil Chromium suite testing carried out for validation of applied liming rates will be deemed to be acceptable if the net acidity level recorded is <0.02%S. Frequency/Timing Retained Water Water quality within basement excavations will be monitored regularly during soil removal and particularly following substantial rainfall events. Treated ASS The sampling and testing of any lime treated soils will be subject to validation testing at a rate of one test per 400m: of treated soil, which will be repeated until satisfactory results are obtained. Contingency Plan If lime treatment of soils is unsuccessful whereby performance targets are not being met as indicated by the validation testing and water quality testing procedures then: © the soil removal schedule will be reassessed. and action taken to determine the problems causing the unsuccessful performance; © if the problems are related to ineffective implementation of the ASSMP, then the plan will be audited by a person nominated by the project manager to ensure improved implementation (monitoring and testing will be increased to ensure compliance with the established standards); and e any significant changes to the ASSMP will be subject to discussions with the relevant regulatory authorities. Responsibility The satisfactory implementation of the ASSMP by the contractor will be the responsibility of the project manager, who will ensure: e the contractor is made aware of site specific conditions and implications for the management of sediments within the site; e the contractor complies with the elements of the ASSMP and erosion control measures proposed; e correct methods for the collection of samples and testing are employed and that the results are reported to the relevant site authorities; and Responsibility (cont'd) e corrective action mnibasUiee proposed by the contractor are approved. The contractor's responsibilities will include: e awareness of site conditions and requirements for the implementation of the ASSMP; Residential Development Appendix C 215-219 David Low Way, Peregian Beach Page 2 of 3 Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.