Original source · versioned page text
Geotech Report - Acid Sulfate Soil Assessment - Appendix A
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Residential Development 215-219 David Low Way, Peregian Beach Draft Acid Sulfate Soil Management Plan (ASSMP) Element Acid Sulfate Soil Management Plan e — supervision of the mixing and soil amelioration process; e modification of earthworks/construction procedures to comply with the ASSMP; e presentation of proposed corrective action measures (if required) which will then be approved by the project manager; and e implementation of approved corrective actions. Reporting The contractor shall report to the project manager representative on: e the effectiveness of the operating strategies; e problems in implementing the ASSMP management strategies; © compliance with testing requirements, run-off control and materials handling; and e effectiveness of any corrective action adopted, Residential Development Appendix C 215-219 David Low Way, Peregian Beach Page 3 of 3 Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.