Appendix D Engineering Site Servicing Report

of 21

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                    PROPOSED DEVELOPMENT



2         PROPOSED DEVELOPMENT
2.1       Development Scope
The proposed development will include the following:

    •    Reconfiguration of lot boundaries to create 2 new residential lots
    •    All lots shall be accessed via a Butler St
    •    All lots are proposed to be serviced with water, sewerage, electrical and NBN
    •    Lawful point of discharge

The proposed Stage 2 ROL development layout is provided in Appendix A.

2.2       Bulk Earthworks and Erosion and Sediment Control
Earthworks will not be required to be carried out as part of the works.

2.3       Access
All lots will be accessed directly from Butler Street. The proposed details are as follows:

    •    Utilise existing driveway crossovers:
              o Provides access to lots and a second development connection to the external Butler Street.
              o 60km/h Design speed utilised for sight distance checks.




             o   Adopting reaction time, RT of 2.0 seconds (urban environment) the required 123m SISD is achieved.
                 Further, access and egress into the proposed driveways could occur in the shoulder of the road,
                 away from the traffic lane, therefore minimising the risk of conflict.
    •    A widening of southern existing driveway crossover for lot 2:
             o 4.2m wide access handle.
             o 3.0m wide concrete driveway the length of the handle located centrally.
             o Water, electrical and NBN conduits to be installed.

The proposed access design is represented on the engineering drawings provided in Appendix A.

2.4       Stormwater
A Dial Before You Dig Investigation has been completed for the site and its surrounding area. No existing stormwater
infrastructure was identified on the subject land. Runoff from the roof of the existing dwelling currently discharges
onto the ground and flows overland onto the downstream neighbouring property. It is proposed to discharge roof
water from the existing dwelling on Lot 1 to a new 3m3 soakage pit.



 SITE SERVICING REPORT                     FERG & ROEDS Ref.                                                        6
 9 Butler St, Tewantin                     201102
 Prepared for K. Courtney                  24 February 2021
Log in to download the original file

Appendix D Engineering Site Servicing Report.pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.