Original source · versioned page text
Appendix 5 - Code Table Assessment
Attached to the e-mail MCU15/0061 Development Application - Appendix 4, 5, 6 & 7 Email 2 of 2.
Specific outcomes Probable solutions Compliance
O35 The generation of spill the use is designed, installed, The facility will not require
light by development, which operated and maintained in the installation of lighting.
gives rise to annoyance, accordance with Section 3 of
discomfort, AS4282 The Control of the
distraction or a reduction in Obtrusive Effects of Outdoor
the ability to see essential Lighting.
information, is avoided.
Mechanical plant and S7.1 Plant and equipment O36 - Complies.
equipment are— The proposed facility will be
O36 Mechanical plant and a) located more than 2m located within the Davis Road
equipment (including air from any property boundary; reserve on a 300 m² term
conditioning equipment) and lease which will be created
are— b) screened by dense into a new Lot. Specifically
a) positioned to minimise vegetation or fencing (i.e. Lot 1 on SP277246 which will
adverse impacts on the 1.5m wide vegetated buffer be registered with the Titles
amenity of any residential area); Office by DNRM (refer to
premises; Appendix 2 – Survey Plan).
b) designed and positioned to OR
visually integrate with the The subject site benefits from
building and roof design; and S7.2 Plant and equipment are the buffer of thick mature
c) appropriately screened. located within a building. vegetation which surrounds
the subject site and will
effectively screen more than
half of the proposed facility
from nearby residential
dwellings. This is considered
to be in accordance with
S7.1b and fully in accordance
with O30.
Furthermore, noise and
vibration emissions
associated with the proposed
facility will be limited to the
construction phase. Noise
generated during the
construction phase will be of
short duration and will be in
accordance with the
standards outlined in the
Environmental Protection
Regulation 1998 and
Environmental Protection
(Noise) Policy 1997.
Construction works will only
occur between the hours of
7.00am and 6.00pm.
There will be some low level
NBN-4BBZ-4GYM-5125 – David Cootharaba Page 82
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.