Appendix 5 - Code Table Assessment

Attached to the e-mail MCU15/0061 Development Application - Appendix 4, 5, 6 & 7 Email 2 of 2.

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Specific outcomes               Probable solutions           Compliance
O35 The generation of spill the use is designed, installed, The facility will not require
light by development, which operated and maintained in the installation of lighting.
gives rise to annoyance, accordance with Section 3 of
discomfort,                   AS4282 The Control of the
distraction or a reduction in Obtrusive Effects of Outdoor
the ability to see essential Lighting.
information, is avoided.
Mechanical       plant     and S7.1 Plant and equipment O36 - Complies.
equipment                      are—                        The proposed facility will be
O36 Mechanical plant and a) located more than 2m located within the Davis Road
equipment (including air from any property boundary; reserve on a 300 m² term
conditioning        equipment) and                         lease which will be created
are—                           b) screened by dense into a new Lot. Specifically
a) positioned to minimise vegetation or fencing (i.e. Lot 1 on SP277246 which will
adverse impacts on the 1.5m wide vegetated buffer be registered with the Titles
amenity of any residential area);                          Office by DNRM (refer to
premises;                                                  Appendix 2 – Survey Plan).
b) designed and positioned to OR
visually integrate with the                                The subject site benefits from
building and roof design; and S7.2 Plant and equipment are the buffer of thick mature
c) appropriately screened.     located within a building.  vegetation which surrounds
                                                           the subject site and will
                                                           effectively screen more than
                                                           half of the proposed facility
                                                           from     nearby     residential
                                                           dwellings. This is considered
                                                           to be in accordance with
                                                           S7.1b and fully in accordance
                                                           with O30.

                                                             Furthermore,        noise    and
                                                             vibration              emissions
                                                             associated with the proposed
                                                             facility will be limited to the
                                                             construction phase. Noise
                                                             generated        during      the
                                                             construction phase will be of
                                                             short duration and will be in
                                                             accordance         with      the
                                                             standards outlined in the
                                                             Environmental         Protection
                                                             Regulation        1998       and
                                                             Environmental         Protection
                                                             (Noise)        Policy     1997.
                                                             Construction works will only
                                                             occur between the hours of
                                                             7.00am and 6.00pm.

                                                             There will be some low level


NBN-4BBZ-4GYM-5125 – David Cootharaba                                          Page 82
Log in to download the original file

Appendix 5 - Code Table Assessment.pdf · 311 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.