ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01
Attached to the e-mail 132005.220.04 Request a Change Existing Approval.
152005.220.01
Properly prepared landscaping plans prepared by a qualified Landscape Architect or
Horticulturist and submitted to Council for approval in conjunction with an application
for any Development Permit for Operational Works incorporating landscaping. The
plan shall show the entire site and road reserves to illustrate all new vegetation
proposed, all existing vegetation to remain, and any vegetation to be removed.
Where other permits for Operational Works for roads, drainage or access are
required, the landscaping layout shall be based on approved drawings for those
Operational Works. The landscaping plans are to include but not be limited to:-
9.1. Street tree planting,
9.2. Road and service locations,
9.3. Vegetating parkland areas,
9.4. Existing vegetation to be retained,
9.5. Measures employed to ensure vegetation retention,
9.6. Removal of undesirable species, and
9.7. Provision of a water service connection to each landscaped area on public
land or road reserve.
Such landscaping is to be completed in accordance with the approved landscaping
plan prior to acceptance of the development On Maintenance and maintained
thereafter for a three-year period to the reasonable satisfaction of the Council.
Acoustic Fence
10. An acoustic barrier fence (1.8 metre high above finished ground level at a minimum)
shall be installed along the rear boundary of Lots 10 - 13. The barrier fence shall be
made from material that is 10Kg/m2 or greater, be continuous and free from gaps or
penetrations and completed prior to sealing of the plan of survey.
Relevant Period
11. The Preliminary Approval to Override the Planning Scheme and Development Permit
for Reconfiguring a Lot lapses if the works have not been completed by
8 October 2013, unless an application to extend the currency is approved by Council.
Security/Bonds
12. Prior to commencement of any Operational Works arising out of this permit, security in
the sum of $150,000 must be lodged with Council, to secure performance of all
conditions of this permit. The security shall be in the form of cash or unconditional
trading bank guarantee acceptable to Council.
Please note that of the $150,000 security, $50,000 shall be held to ensure
compliance with the environmental conditions.
13. The security will be returned upon satisfactory performance of all the conditions of this
permit and any other related development permits for Operational Works, less any
costs incurred by Council in ensuring compliance with these conditions or for any
additional inspections incurred for substandard work or work undertaken not in
accordance with this permit.
Plan of Survey
14. For the purpose of conditions contained within this permit, a Plan of Survey means
the plan for the reconfiguration of a lot required to be endorsed by Council pursuant to
S3.7.1 of the Integrated Planning Act 1997.