ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01

Attached to the e-mail 132005.220.04 Request a Change Existing Approval.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                   152005.220.01

Plan of Survey for Endorsement
15.      In conjunction with the lodgement of the Plan of Survey for Council endorsement, all
         legal documentation shall be presented to Council and shall be submitted in the
         correct form with the fees prescribed in Council's adopted fee schedule.
16.      Prior to Council endorsing the Plan of Survey, a duly executed copy of any required
         Grant of Easement shall be submitted to Council for perusal.
          Any changes required by Council’s Solicitor shall be attended to prior to endorsing the
          Plan of Survey.
          Any necessary Titles Office forms requiring the consent of Council are to be
          submitted prior to the endorsing of the Plan of Survey.
17.      Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give
         Council's Solicitor an appropriate undertaking in writing that in conjunction with
         lodgement of the Plan of Survey at the Land Titles Office, the Title Deed and the
         easement documents will also be lodged and any additional Titles Office forms or
         requisitions requiring the consent of Council being attended to forthwith.
18.      Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates
         and charges due and payable to Council in respect of the lots being reconfigured shall
         be paid prior to endorsement of the Plan of Survey.
19.      Prior to Council endorsing the Plan of Survey, a certificate from a registered
         professional civil engineer shall be submitted to Council for each Development Permit
         for Operational Works issued pursuant to this permit. The engineer shall certify that
         he has supervised those works and that they have been completed in a workman like
         manner in accordance with good engineering practice and in accordance with that
         permit.
Removal of Existing Services
20.      All existing power poles and overhead electricity wires that currently traverse the site
         and are no longer needed as a result of the proposed development (such as the
         above ground power line that enters across the southern boundary of the site and
         extends to the existing shed and dwelling house via 3 power poles) shall be removed
         and any existing easement no longer required as a result of the proposed subdivision
         shall be extinguished.
Dedications
21.      Upon registration of the Plan of Survey the land indicated as Lot 100, Lot 101 and Lot
         102 intended for Park Purposes (and any amendments made to this area as a result
         of this approval), shall be dedicated to Council at no cost. Lot 100 shall be dedicated
         as Public Use Land – Open Space & Buffer Zone Purposes and Lot 101 and Lot 102
         shall be dedicated as Public Use Land – Environmental Purposes.
22.      Upon registration of the Plan of Survey the Jarrah Street road extension shall be
         dedicated as road reserve.
23.      Upon registration of the Plan of Survey two maintenance vehicle access points shall
         be dedicated as road reserve to enable access to the various park areas located to
         the rear of the proposed industrial allotments. These maintenance access points shall
         be at least 6m wide and provided between Lots 11 and 12 and 17 and 18.
External Roadworks
24.      Prior to endorsement of the Plan of Survey a Heavy Vehicle Bypass (HVB) road must
         be completed and available for trafficable use through the Cooroy Sports Fields to link
         Jarrah Street/Mary River Road intersection with Garnet Street to minimise the impacts
         of the proposed development on the road network.




FM1512s/1-07/04/2010                                                             Page 5 of 19
Log in to download the original file

ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01.pdf · 267 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.