REC14/0007 & OPW14/0253 Report
Land Surveying Dynamics June 2014
SPECIFIC OUTCOMES PROBABLE SOLUTIONS COMMENTS
site areas that—
a) maximise solar access to the north in winter; AND
b) minimise solar access to the east and west in the summer; S13.2 Community Title Development lots are
c) maximise access to any prevailing summer breezes; and generally rectangular in shape and have a
d) minimise exposure to prevailing winter winds. maximum slope of—
a) 1 in 10 (10%); and
b) 1 in 20 (5%) when measured from the front to the
rear of the lot.
S14.1 No Solution provided
Infrastructure
O15 Each lot is capable of being serviced by appropriate levels S15.1 All lots are connected to power supply and Complies.
of— telecommunications services; The site is connected to all essential
a) water supply; AND services and subsequently, each lot is
b) reticulated sewerage; S16.1 For lots in urban settlements—power supply capable of being serviced by these
c) stormwater drainage; and communications infrastructure are provided existing services.
d) power supply; and underground;
e) telecommunications; OR Operational Works plans are provided
S16.2 For lots elsewhere—power supply and under separate application .
AND communications infrastructure are provided
O16 The design and provision of public services and utilities, underground unless—
including sewerage, water, electricity, street lighting and a) located in the Rural Zone or Rural Settlement
telecommunication services— Zone and where not in a Bushfire Hazard Area as
a) meets the needs of users; defined on Overlay Maps OM1.4-OM9.4;
b) ensures health, safety and convenience of the community; b) new low voltage lines can be strung from poles
c) protects the natural environmental values of the site and carrying existing high voltage lines; or
surrounds, including visual amenity and native vegetation; c) no extensions to the existing reticulation network
d) are cost effective over their life cycle; is necessary; or
e) minimises adverse impacts to the environment (including the d) it is necessary to cross a body of water;
amenity of the local area) in the short and long term; and
f) ensures that the existing systems are upgraded or relocated to AND
be capable of supporting the proposed development; S16.3 Street lighting is provided in accordance with
Section 3.19 of PSP5 Engineering Design
AND Standards – Roads, Drainage and Earthworks;
AND
S16.4 For lots not within a sewerage service area—
O17 Essential public utilities are available and maintain their the lot has sufficient area and other attributes to
35
function during flood events up to a 1% AEP (1:100 year ARI) ensure sustainable on-site sewerage disposal ;
flood event.
Reconfiguring of a Lot – Three (3) into Four (4) Lots
8 Stevens Street, Sunshine Beach
RPD: Lots 675 and 697 on RP48111 and Lot 676 on SP125656 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
REC14/0007 & OPW14/0253 ReportRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.