Original source · versioned page text
Negotiated Decision Notice 131998 981211 5
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
Building
1. The Plans submitted for the Development Permit for building works are comply with the
approved plans.
2. Construction work associated with the 18 hole par 3 golf course element of the complex shall
not be permitted on Sundays public holidays or between the hours of 6:00 pm and 7:00 am,
provided that these hours may be modified with specific approval from the Manager of
Building.
Health
3. A greased arrester should be provided at the clubhouse (if food preparation or cooking
occur). Include all trade waste information on the hydraulic drawings.
Engineering
4. Prior to undertaking any excavation, the person acting on this permit shall contract public
utility service providers to ascertain the location of their underground services.
5. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class
of work. The application may combine any or all of these classes of work –
• Access and/or carpaking
• Drainage
• Frontage works
• Roadworks
• Site Filing
• Excavation of materials to fill another site
• Landscaping
6. The person acting on this permit shall apply and obtain for all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation permits
and/or any other approvals required under any other Act.
7. Before the issue a Development Permit for Operational Works, the Applicant shall sign a
written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the
proposed development.
If any Council property or facilities (such as underground drainage) is damaged by any
person acting under a condition of this permit, though may cause whatsoever in the course
of, directly or indirectly carrying out development, that person shall forthwith notify the
Manger-Land Development an shall forthwith rectify that damage as its cost and to the
satisfaction of the Manager-Land Development.
Alternatively, the Applicant may request the Council to carry out the rectification works.
In all cases, Council reservices the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of
the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
commencement of the use.
Page 2 of 20
Document Set ID: 23699332
Version: 3, Version Date: 22/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.