Skip to the record
Search everything, all in one place.

Original source · versioned page text

Negotiated Decision Notice 131998 981211 5

of 20

Page text shows just the words. Original shows the document exactly as it was published.

               8.     The Assessment Manager for building work shall ensure that all other permits required by
                      this permit have been obtained and outcomes from imposed conditions incorporated into the
                      building plans prior to issue of a Development Permpermait for Building Works.
               9.     All parking associated with the approved use shall be provided within the development site.
                      Formalised On-Site parking shall be for at least 80 car spaces, 2 Tourist Bus bays, including
                      a minimum of 10 spaces for staff. At lease 4 spaces shall be clearly marked for disabled
                      car spaces.
                      Additional contingency car parking shall be provided on shite for at least another 10 car
                      spaces and 1 tourist Bus and expanded as necessary to meet demand.
                      The car parking areas shall be designed to comply with the provisions as AS 2890.1-1993
                      for user class 2.
               10.    The formal car parking area shall be drained and the constructed with gravel pavement using
                      materials that minimise dust.
                      The access from the property boundary to the car park area shall be constructed to access
                      road standards except as a sealed road for the first 100 meters from the property boundary
                      and gravel thereafter using materials consistent with the formal car park area. Plans
                      specifications for these works shall be submitted in conjunction with an application for a
                      Development Permit for Operational Works
               11.    Provided that the use authorised by this permit has not lapsed, all carparking shall be kept
                      maintained and line-marked in a condition fir for use to the reasonable satisfaction of the
                      Manager-Land Development.
               12.    A contribution toward roadworks external to the development site in the Cootharaba Road
                      catchment shall be paid prior to the commencement of the Integrated Permaculture Designed
                      Organic Orchard and Golf Course Complex. The amount of the contribution as at September
                      1999 is $100,000 and shall be subject to changes in the Consumer Price Index, All Groups
                      Brisbane, up until the date of payment.
               13.    Prior to the commencement of the use, Kabi Road shall be upgraded to local road standard
                      of 6m seal on 8m gravel formation for its full length from the intersection with Cootharaba
                      Road to the development site, at not cost to Council.         Subject to satisfactory traffic
                      management being incorporated into the design of Kabi Road and fill batters being at a
                      maximum grate of 1:6, the gravel pavement width may be reduced to 7 metres. Design
                      details to be submitted in conjunction with the application for a development permit for
                      operational works.
               14.    No Council property of facility shall be interfered with during works associated with this
                      development.
               15.    All designs for engineering works involving the construction of pavements, kerb and channel,
                      vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage
                      reticulation shall be prepared in accordance with the requirements of Council’s Engineering
                      Design Standards, shall refence where applicable to Council’s Standard Drawings and shall
                      incorporate best engineering practice.
               16.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings
                      and specifications for all engineering works which shall be submitted in conjunction with an
                      application for Development Permit for Operational Works.
               17.    Prior to commencement of the use, a certificate shall be submitted to Council from a
                      registered Professional Civil Engineer certifying that he has supervised all operational works
                      and that all works have been completed in workmanlike manner in accordance with good
                      engineering practice and in accordance with permits/approvals required pursuant to this
                      approval.
               18.    The following steps are undertaken prior to commencement of any construction on a public
                      road:



                                                                                                      Page 3 of 20
Document Set ID: 23699332
Version: 3, Version Date: 22/04/2025
Log in to download the original file

Negotiated Decision Notice 131998 981211 5.pdf · 222 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.