Job No. C06/023

3.3.4 Installation of piled foundations on this site would be the same as that on any other sand site,
consequently the same design parameters apply.

e.g. Ultimate Base Resistance = 120N" kPa
= 120 DCP kpa--------- (1)
1.3
() Where "N" is the value obtained from the Standard Penetration Test.
2) OCP is the number of Dynamic Cone blows/300mm.

The reduction factor of 1.3 was found in test correlation for dune sand with Standard Penetration
tests and Dynamic Cone Penetrometer tests taken side by side at equivalent depths up to 10
metres.

Using the data from the Golder report, the ultimate bearing capacity at a depth of 8 metres is 2.4
MPa.

3.4 House Foundations

Vertical loads may be taken on steel screw piles dimensioned for the design load (estimated to be in the
range 10-15 tonnes) and the base resistance as given in equation 1. Pile resistance can be gauged by
the installation torque.

Single helix screw piles are seen as a practical solution, at a depth in the range 8 to 12 metres, the
lesser depth representing the lower end of the load range. A minimum helix diameter of 300mm is
anticipated, but should be confirmed by the specialist piling contractor. The advantage of using screw
piles is that each pile has a test load which is directly related to the installation torque.

Corrosion protection will be needed on screw piles in the zone of likely molsture movement from natural
processes and trees, which depth Is seen to be equivalent to the very loose/loase sand depth of 3.0
metres.

3.5 Slope Stability .

Long term stability can be achieved by providing earth retaining systems to support the slope in the
construction area, An anchored support would involve tess site disturbance, would be the most
economic and could be installed at a lesser cost than any concrete cantilever pile system.

3.5.1. General Slope
It would be unreasonable to assume that all of the top very loose/loose sand could be removed
below the house footprint. In an extreme event any debris from a sand slip would contain trees
and tree roots for which the angle of repose or friction angle would be consistent with the slope
as it now stands (32 degrees). This slope for all practical purposes represents a Factor of Safety
(FOS) of 4.0 which can be improved to not less than 1.5 using the sand anchor system.

3.5.2 Centre to Northern Part
For the central to north part of the site, the most likely worst case slip is the removal of 1.5
metres of sand fram below the house footprint which would lessen the present average slope
from 36.5 degrees to 32 degrees. The slip feature as noted above has already removed 1.5
metres of sand which is consistent with this design recommendation as a long term solution for
support to the slope in the event of sand removal below the house.

There are three wall design cases as marked on the enclosed plan (Figure 1).

 

 

 

 

Case No Wall Location Slope Below Wall Design Height
' Top RU. 2.0m 32° 4.0%m
2 Top Rt 32.0m 36.6° 1.5m
3 Ton Bh a8. 0m 20° 1.5m (max)

 

 

 

 

 

 

Note this height takes into account an increase in the slope steepness at Park Road

00697 S Biggs MORRISON GEOTECHNIC

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.