Council archive · source document
08/0746 - Op Works - Stormwater [As Published] · 142008.746
at July 2003 -6- 02682118(AD) Ground water flow parallel to the slope may result in significant erosion. It is therefore important that surface and stormwater drainage systems are designed such that surface runoff is collected and, as little water as possible penetrates into the slope. It is our assessment that the proposed irrigation system under the house will have negligible impact on slope stability subject to the installation of a permanent surface erosion protection system in combination with the proposed planting. In sand, erosion and the risk of instability can be minimised provided surface protection is maintained and concentrated high velocity flow is not allowed to occur. Sand is highly permeable and most water wil) travel directly downwards and not across the surface. By irrigating the plants on the slope beneath the house using a fine mist system at the proposed rate of 5 mm/hour, it is our assessment that the resultant impact on slope stability will be negligible and substantially less than that which occurs naturally during heavy or prolonged periods of rainfall. The slope will be shielded from such rainfall by the proposed house. The method of irrigation (ie. fine mist spray) will prevent concentrated surface water flows. Given the highly permeable nature of the dune sands, and the low rate of irrigation proposed, it will not be possible for saturated conditions to develop under the house. Without saturation of the sands, there will be a negligible risk of major slope instability. If the plants die, the irrigation system will 20 longer be necessary and, consequently, will be shut off. This will result in no impact on the site stability subject to the installation of surface erosion protection as recommended. No cutting or filling can be allowed on site, and material excavated from the foundations should not be stockpiled on the surface. Undercutting of the slope is likely to initiate slope instability, and should be avoided. It is recommended that the driveway, where necessary, be suspended on piled foundations (ref Section 6.3). Cutting and filling shall not be undertaken on this site. As discussed previously, there are indications that the loose surface sand has undergone creep movement down the slope. However, our experience in the area indicates that it is unlikely that such creep will have a significant effect over the life of the structure if it is properly designed. If the guidelines above are followed, it is considered that the factor of safety against Slope instability will be satisfactory and commensurate with the safety factors for similar developments on similar sites in the area. 6.3 Foundations The stability of the slope has a significant bearing on the available foundation options. The Possibility of isolated shallow slips can not be precluded and there is evidence of a shallow slip at the head of the gully. For this reason, high level foundations are not recommended to support the proposed building. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.