PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
Site Access and Driveways
31. A sealed access driveway must be provided from Nannygai Street to all parking and
manoeuvring areas of the development. The works must include in particular a
driveway crossover in accordance with IPWEAQ standard drawing SEQ R-051with a
maximum width of 6 metres at the property boundary.
Car Parking
32. A minimum of 9 car parking spaces must be provided and marked on the site. The
works must include crossfalls, gradients and dimensions in accordance with Australian
Standard AS2890: Parking Facilities
33. All vehicles must enter and exit the site in a forward gear.
Footpath
34. A pedestrian and bicycle footpath must be provided for the development. The works
must include in particular a 2.0 metre wide footpath within the road verge for the entire
length of the site’s frontage to Nannygai Street. This condition is imposed pursuant to
s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure.
Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge.
36. All stormwater runoff from the site must be discharged in to Council’s kerb and channel
drainage system in Nannygai Street.
37. Approved kerb adapters must be constructed at each outlet point.
38. Electricity and Telecommunication Services
39. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
40. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Earthworks and Retaining Walls
41. All fill and associated batters must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
42. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
Damage to Services and Assets
43. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Page 73 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.