2014-09-16 Planning & Organisation Committee Agenda

of 141

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              16 September 2014


      d.   Establishment of a communication protocol with the general public, adjoining
           owners, emergency services and local businesses to advise of agreed
           construction times, impacts on traffic and services and other relevant issues
5.    Any conflict between the development and an existing or proposed service must be
      referred to the relevant service authority for determination prior to commencement of
      works.
      During Construction
6.    The developer must meet any costs to repair damage to any Council asset during
      construction, where damage is a result of the development works. Damage to assets
      must be repaired immediately where it creates a hazard to the community. In
      circumstances where the damage does not create a hazard to the community, it must
      be repaired immediately on completion of the works associated with the development.
      A condition report including photographs of the frontage of the site should be
      completed and submitted to Council at the prestart meeting or prior to any works
      commencing (where no prestart meeting is to occur).
7.    All works must be supervised by a Registered Professional Engineer of Queensland
      (RPEQ) who is independent of the Developer and Principal Contractor, and they must
      certify that all works conform to the Operational Works permit. Where municipal works
      are involved, such confirmation must be submitted for the respective hold points prior
      to any site inspection by Council Officers.
8.    All works must be constructed and work procedure undertaken in accordance with:
      a.   The approved plans/documents and conditions detailed in this Decision Notice
      b.   All relevant Noosa Council Planning Scheme Policies, standard drawings,
           standard specifications and guidelines
      c.   The latest version of the Healthy Waterways document “Water Sensitive Urban
           Design Technical Design Guidelines for South East Queensland” for all water
           quality devices to be constructed on site
      Works Within Road Reserve/Reinstatement
9.    Safe pedestrian access on all streets in the vicinity of the development must be
      maintained at all times. Should footpath/road closures be necessary to carry out
      construction works, Council’s Engineering Officer must be notified prior to the
      proposed closure and all requirements complied with.
10.   All frontage works must match neatly with existing road and verge/footpath features.
      Additional works beyond the frontage may be required to provide an acceptable
      transition to existing road and verge/footpath profiles.
      Pathways
11.   All pathways must be constructed in accordance with the following requirements:
      a.   All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065.
      b.   All paths must have a slip resistant surface
      c.   Expansion and contraction joints must provide a flush finish. Installation of joints
           by saw cutting is preferred to ensure a smooth ride for cyclists
      d.   The required work includes any modifications to ensure the footpath finishes
           flush with all existing service covers and the like, or alternatively these services
           are raised or altered, so as not to create a pedestrian safety hazard




                                                                                   Page 75 of 145
Log in to download the original file

2014-09-16 Planning & Organisation Committee Agenda(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.