MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
Noosa Civic Engineering Report 5 Groundwater Previous geotechnical assessment across the site (Report on Geotechnical Investigation – Noosa Business Centre – Stage 1, Golder Associates Pty Ltd, August 2004), particularly on the eastern boundary of the existing development, disclosed no presence of groundwater down to levels of 1.5 m AHD. Given that the plans for the proposed development require earthworks down to 5.2 m AHD, it is expected that groundwater issues will not be significant during the construction phase of the project. It is expected that the presence or otherwise of groundwater on the development site will be determined during the geotechnical investigation proposed for that area prior to commencement of construction. However, existing information indicates that it is quite unlikely that groundwater will be encountered during the construction phase. QIC Noosa Civic Pty Ltd Version 1 November 2014 engineering report_final.docx Page vii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.