Noosa Civic Engineering Report 4 Geotechnical and Acid Sulfate Soil Issues A detailed sub-surface geotechnical investigation was completed by Golder Associates prior to the development of the existing Noosa Civic site in August 2004 (Report on Geotechnical Investigation – Noosa Business Centre – Stage 1, Golder Associates Pty Ltd, August 2004). 21 test pits and boreholes with depths varying from 2.50 to 5.00 m were excavated across that part of the site west of the OS7 area. The results for the testing showed a consistent profile across the area of investigation, with silty and clayey sand at the surface generally overlying silty and sandy clays grading at depth into low strength sandstones. A copy of the previous report in included herein as Appendix A. GA15, GA11, GA17 and GA18 are located generally close to the western boundary of the proposed development. The logs for each of these test pits show consistent stratigraphy with sands overlying sandy clays. No evidence of sandstone was found in these eastern pits which were excavated to depths of 2.50 to 3.00 m. Test pits GA11, GA17 and GA18 were terminated at levels of 3.50, 2.00 and 1.50 m AHD respectively. At this stage, no test pits have been dug on the development area, since to do so will require significant removal of vegetation and other land disturbance. However, surface investigation provides no sign that sub- surface conditions will vary from that found on the western part of the Noosa Civic site. Golder Associates concluded that all materials should be excavatable using conventional earthmoving equipment, and that the sand and clays soils won by excavation would be suitable for reuse as structural fill. It is noted that the extent of fill required for the development is significantly less than on the western part of the Noosa Civic site, primarily because of the presence of the undercroft carpark. A significant volume of material excavated from the site will need to be disposed of as spoil external to the project. It is proposed that a level of geotechnical investigation to confirm the above findings will be undertaken prior to the commencement of construction. This will include excavation of test pits across the site east of OS7. Golder Associates also undertook an acid sulfate soils investigation for the existing Noosa Civic site (Section 7 of the Geotechnical Investigation Report). According to acid sulfate soil mapping prepared by the Department of Natural Resources, the site is defined as “land >5 m AHD with a low to negligible probability of ASS occurrence”. Both field and laboratory tests were undertaken on soil samples collected from test pits GA17 and GA18, albeit at levels below 5.0 m AHD. It was determined that there was negligible probability for the occurrence of Potential Acids Sulfate Soils (PASS) on the site, which was expected since the tested layers were above the water table level, i.e. soils on the site are likely to have already been oxidized by exposure to the atmosphere. Correspondingly, the soils displayed slight actual acidity. Surface soils in these tests (at 5.0 m AHD) required a minimal liming rate of about 5 kg of lime per tonne of soil. The proposed floor level of the undercroft carpark is 5.5 m AHD. Allowing for excavation for concrete slab construction purposes, the minimum level of excavation generally over the site will therefore be approximately 5.2 m AHD. There will be a small basin adjacent to the undercroft carpark associated with a stormwater detention and bio-retention basin that will include excavation below 5.0 m AHD. The State Planning Policy for Queensland specifies that acid sulfate investigations should be undertaken where disturbance takes place below 5.0 m AHD, and the volume of excavation is at least 100 m 3. In this case, the volume of excavation below 5.0 m AHD is likely to exceed 100 m 3, and an acid sulfate soils investigation will therefore be required. It is noted that the previous testing was undertaken at a time when no distinction was drawn between sulfidic and organic acidity. The source of the actual soil acidity in this case is not known, but may in fact be organic since no sulfur content was detected during testing. Council’s Planning Scheme (Natural Hazards Overlays Code) also requires acid sulfate soils assessment when earthworks are undertaken below 5.0 m AHD. Given the small area of disturbance in the proposed detention basin (see Figure 2) the requirement for acid sulfate soils investigations will be relatively minor. In addition, it is unlikely that extensive treatment of acid sulfate soils will be required because of the low acid generating capacities of the existing soils. These investigation works will be undertaken prior to commencement of any earthworks on site after relevant site clearing has taken place. QIC Noosa Civic Pty Ltd Version 1 November 2014 engineering report_final.docx Page vi
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.