Construction Environmental Management Plan
Table 4-1 Construction Stormwater Quality Objectives 1
Water Quality Parameter Release Criteria
Suspended Solids < 50 mg/L
Coarse Sediments Retain coarse sediments onsite
Turbidity < 10% above receiving waters
pH 6.5 – 8.5
Hydrocarbons, Oil and Grease No visible film; no detectable odour
Floating matter None visible
1
Queensland Water Quality Guidelines (2009) Table 8.2.1: Summary of design objectives for management of stormwater quality and flow – construction phase of development in
Queensland.
Management Measures
Tasks Actions / Monitoring Timing Responsibility
Develop an ESCP for each stage Undertake an Erosion Hazard Assessment of the site prior to the commencement of Ongoing Environmental
of the project. works and ensure the project CEMP and any ESCPs are commensurate with the Management
Erosion and sedimentation control degree of environmental risk associated with the proposed works. Officer
measures must be designed in Wherever practicable, give priority to the prevention or minimisation of soil erosion,
accordance with the requirements rather than the trapping of displaced sediment, and ensure the area of disturbance is
of the Draft Urban Stormwater – no greater than the minimum area necessary for the purpose, and limited to the
Queensland Best Practice shortest amount of time practicable.
Environmental Management Select machinery to carry out the activities on the basis of a type and size necessary
Guidelines (DERM, 2009) in order and capable of safe operation to achieve minimal disturbance of the site.
to protect the receiving
environment in the vicinity of the Appropriate sediment and erosion control measures may include sediment fences
site. (anchored in a 0.2m deep compacted backfilled trench), stormwater diversion drains,
rock check dams and progressive site restoration.
Implement the ESCP for each
stage of the project. Ensure unprotected slope lengths do not exceed 80m, or an equivalent vertical fall of
3m, prior to a construction shutdown period or anticipated significant rainfall.
Ensure stormwater diversions are included up-catchment of the project disturbance
footprint.
Ensure trenches/excavated areas are backfilled, capped with topsoil and compacted to
a level at least 75mm above the adjoining ground level, and appropriately stabilised.
Machine-compact, seed and mulch all temporary earth banks and flow diversion
Noosa Civic Version 1 November 2014
Appendix B - Construction EMP.docx Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.