Noosa Civic Construction Environmental Management Plan 4.6 Element 6: Public Amenity and Community Rationale The site is unlikely to be visible to nearby residents and passing motorists, given that existing natural vegetation between the site and adjoining areas will be retained. However, construction works have the potential to adversely impact local public amenity in the vicinity of the site in the short term, as a result of noise, dust emissions, visual impacts and potential changes to public access and travel arrangements. The staging of construction works will allow for the continuity of surrounding land uses (i.e. shopping centre, and residential and industrial uses) where appropriate. However the works may impact on the surrounding land users and the community, and vice versa. These impacts need to be managed during the construction works in accordance with the identified management measures. Objective/Target To ensure persons potentially affected by the works are notified of the nature, duration and timing of the proposed works. To minimise adverse impacts to public amenity as a result of noise, dust emissions, visual impacts and changes to public access and travel arrangements, as far as practicable. To minimise the disturbance of construction works on surrounding land users and vice versa. Performance Indicators Compliance with all relevant legislative frameworks such as the EP Act, EPP Noise, Council local laws, and relevant health and safety requirements. People potentially affected by the works are informed of the nature, duration and timing of the proposed works. Any complaints are responded to within one working day. Noise levels must comply with the noise objectives when measured at the nearest sensitive receptor shown in Table 4-2 below. Noosa Civic Version 1 November 2014 Appendix B - Construction EMP.docx Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.