MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 115, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Construction Environmental Management Plan



4.6                Element 6: Public Amenity and Community
Rationale

The site is unlikely to be visible to nearby residents and passing motorists, given that existing natural vegetation between the site and adjoining
areas will be retained. However, construction works have the potential to adversely impact local public amenity in the vicinity of the site in the
short term, as a result of noise, dust emissions, visual impacts and potential changes to public access and travel arrangements.
The staging of construction works will allow for the continuity of surrounding land uses (i.e. shopping centre, and residential and industrial uses)
where appropriate. However the works may impact on the surrounding land users and the community, and vice versa. These impacts need to
be managed during the construction works in accordance with the identified management measures.
Objective/Target

To ensure persons potentially affected by the works are notified of the nature, duration and timing of the proposed works.
To minimise adverse impacts to public amenity as a result of noise, dust emissions, visual impacts and changes to public access and travel
arrangements, as far as practicable.
To minimise the disturbance of construction works on surrounding land users and vice versa.
Performance Indicators

Compliance with all relevant legislative frameworks such as the EP Act, EPP Noise, Council local laws, and relevant health and safety
requirements.
People potentially affected by the works are informed of the nature, duration and timing of the proposed works.
Any complaints are responded to within one working day.
Noise levels must comply with the noise objectives when measured at the nearest sensitive receptor shown in Table 4-2 below.




Noosa Civic                                                            Version 1                                                       November 2014
Appendix B - Construction EMP.docx                                                                                                          Page 22
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.