Noosa Civic
Construction Environmental Management Plan
Table 4-2 General nuisance noise level limits
Sensitive Time of Day Acoustic quality objectives (measured at the Environmental
Receptor receptor) Value
LAeq,adj,1hr LA10,adj,1hr LA1,adj,1hr
Dwelling Daytime and 50 55 65 Health and
(outdoors) evening wellbeing
Dwelling Daytime and 35 40 45 Health and
(indoors) evening wellbeing
Management Measures
Tasks Actions / Monitoring Timing Responsibility
Advise residents, land owners Erect signage at the site in a place viewable by local residents, land owners and patrons Two weeks Contractor
and patrons of the current displaying generic details of the works program with the proposed timeframe, or provide prior to
facilities who may potentially be this information in the form of a mail out/letter box drop to potentially affected residents commencem
affected by construction activities and landowners. ent of
of the works program. Ensure communications provide a point of contact for complaints, including a contact construction,
Notify community members of telephone number which is manned during working hours, and a 24-hour emergency and ongoing
construction site working hours, contact number. thereafter
and clearly state these on Ensure that the impacts in the interaction between construction works and the ongoing
signage at the site. use of surrounding land uses is minimised as far as practicable by:
engaging in ongoing weekly communications with surrounding land users so as to
communicate constructions plans for the week and potential disruption to
surrounding land users; and
implementing the necessary management measures and controls to minimise any
impacts (i.e. erecting signage, fencing, protection nets, etc).
Minimise activities resulting in the Operate and maintain all vehicles and equipment in accordance with the manufacturer’s Ongoing Contractor
introduction of excessive dust and specifications.
fumes to the local atmosphere as Do not undertake burning of waste materials at the site.
far as practicable.
Ensure all loads entering and exiting the site are securely covered to avoid dust
generation.
Cease any dust-generating activities during windy conditions.
Deploy water trucks when dust is visible beyond site boundaries for longer than 15
minutes.
Noosa Civic Version 1 November 2014
Appendix B - Construction EMP.docx Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.