MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 117, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Construction Environmental Management Plan



 Tasks                                  Actions / Monitoring                                                                           Timing           Responsibility
                                        Dust suppression measures shall be used onsite to provide dust suppression for the
                                        construction area when dust is visible and clearly leaving the worksite boundary.
                                        Onsite speed limits shall be strictly enforced.
                                        Inspect all vehicles entering and leaving the site, and remove excessive soil build up as
                                        required.
                                        Stabilisation of exposed soil areas and slopes shall be undertaken as soon as
                                        practicable following disturbance.
                                        Visual inspection of former bare earth areas shall be undertaken after stabilisation
                                        and/or revegetation to ensure measures are effective.
 Noise emissions criteria shall be      Noise emissions originating from construction activities must comply with the project DA       Ongoing          Environmental
 in accordance with the EPP Noise       noise conditions, and if not specified with the EPP Noise criteria in Table 4-2 at the                          Management
 guidelines.                            nearest noise sensitive receptor.                                                                               Officer/
                                                                                                                                                        Contractor
 Working hours at the site shall be     Unless otherwise approved in writing by a relevant administering authority or in               Ongoing          Environmental
 limited to those stated in the         response to an environmental incident or other emergency, ensure construction hours                             Management
 Contract. Wherever practicable,        are confined to within 6.30am and 6.00pm, Monday to Saturday, with no work on                                   Officer/
 noise-generating activities shall      Sundays or Public Holidays.                                                                                     Contractor
 be minimised.
 All noise and/vibration generating     In the event of the adjusted noise level for a single noise source or activity significantly   Ongoing          Environmental
 mobile and stationary plant,           exceeding the background noise level, consideration shall be given to restricting the                           Management
 equipment, and processes shall         times during which the activity can take place to a number of separate hours each day.                          Officer/
 be controlled to minimise noise        Control all noise-generating mobile and stationary plant, equipment, and processes to                           Contractor
 emission in accordance with AS         minimise noise emission in accordance with AS 2436: Guide to Noise Control on
 2436:2010 Guide to Noise               Construction, Maintenance and Demolition Sites.
 Control      on       Construction,
 Maintenance and Demolition             Ensure all equipment and vehicles are in good working order, so as to minimise
 Sites.                                 unnecessary noise.

 Provide    adequate       signage,     Develop a Safety Signage Plan for the site works prior to the commencement of works.           Prior       to   Contractor
 barricades and information to          Ensure the plan provides proper warning to persons or motorists approaching the                commencem
 maintain     a     safe      traffic   construction site.                                                                             ent         of
 environment for staff, pedestrians     Ensure the Safety Signage Plan is implemented throughout the duration of the site              construction,
 and motorists.                         works.                                                                                         and ongoing

 Ensure material delivery and           Ensure materials are delivered during standard working hours only.                             Ongoing          Contractor
 unloading activities do not            Ensure trucks and vehicles are loaded and unloaded on-site only.
 adversely impact local access



Noosa Civic                                                                     Version 1                                                                November 2014
Appendix B - Construction EMP.docx                                                                                                                            Page 24
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗