Construction Environmental Management Plan
Tasks Actions / Monitoring Timing Responsibility
Dust suppression measures shall be used onsite to provide dust suppression for the
construction area when dust is visible and clearly leaving the worksite boundary.
Onsite speed limits shall be strictly enforced.
Inspect all vehicles entering and leaving the site, and remove excessive soil build up as
required.
Stabilisation of exposed soil areas and slopes shall be undertaken as soon as
practicable following disturbance.
Visual inspection of former bare earth areas shall be undertaken after stabilisation
and/or revegetation to ensure measures are effective.
Noise emissions criteria shall be Noise emissions originating from construction activities must comply with the project DA Ongoing Environmental
in accordance with the EPP Noise noise conditions, and if not specified with the EPP Noise criteria in Table 4-2 at the Management
guidelines. nearest noise sensitive receptor. Officer/
Contractor
Working hours at the site shall be Unless otherwise approved in writing by a relevant administering authority or in Ongoing Environmental
limited to those stated in the response to an environmental incident or other emergency, ensure construction hours Management
Contract. Wherever practicable, are confined to within 6.30am and 6.00pm, Monday to Saturday, with no work on Officer/
noise-generating activities shall Sundays or Public Holidays. Contractor
be minimised.
All noise and/vibration generating In the event of the adjusted noise level for a single noise source or activity significantly Ongoing Environmental
mobile and stationary plant, exceeding the background noise level, consideration shall be given to restricting the Management
equipment, and processes shall times during which the activity can take place to a number of separate hours each day. Officer/
be controlled to minimise noise Control all noise-generating mobile and stationary plant, equipment, and processes to Contractor
emission in accordance with AS minimise noise emission in accordance with AS 2436: Guide to Noise Control on
2436:2010 Guide to Noise Construction, Maintenance and Demolition Sites.
Control on Construction,
Maintenance and Demolition Ensure all equipment and vehicles are in good working order, so as to minimise
Sites. unnecessary noise.
Provide adequate signage, Develop a Safety Signage Plan for the site works prior to the commencement of works. Prior to Contractor
barricades and information to Ensure the plan provides proper warning to persons or motorists approaching the commencem
maintain a safe traffic construction site. ent of
environment for staff, pedestrians Ensure the Safety Signage Plan is implemented throughout the duration of the site construction,
and motorists. works. and ongoing
Ensure material delivery and Ensure materials are delivered during standard working hours only. Ongoing Contractor
unloading activities do not Ensure trucks and vehicles are loaded and unloaded on-site only.
adversely impact local access
Noosa Civic Version 1 November 2014
Appendix B - Construction EMP.docx Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.