Original PDF page 8, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Engineering Report




3                    Electricity Supply
The proposed development is within the Energex electricity distribution area. Based on the area of the
proposed development, the maximum demand for the proposed development will be approximately 3-4MVA.
Therefore, approximately four 1MVA 11kV/400V transformers will be required to serve the proposed
development. Since the maximum demand is over 1MVA, Energex will require the site to connect via the
Energex Large Customer Connection process. There is an Energex pre-feasibility enquiry form that can be
completed to determine the impacts on existing Energex infrastructure. This enquiry will be undertaken at an
appropriate time prior to planning approval being granted.
Based on a desktop audit of the DBYD Energex maps, it seems that conduits have been installed in the
current Noosa Civic centre for future electricity cabling to serve the proposed development (see sheets 4 & 5
in the attached Figure 1). Potentially there is scope to take an 11kV supply from the existing transformer
SG765138, and reticulate through existing conduits to serve new 11kV transformers as required for the
proposed development. If the existing 11kV reticulation in the area is close to its maximum loading, a new
11kV circuit may be required from a 33/11kV distribution substation. The closest distribution substation is
located on Eumundi Road approximately 1.3km from the proposed development site.
Based on this desktop audit, there are no major issues in providing electricity to the site, subject to
confirmation from Energex.
Discussions on the project have commenced with Energex, but no formal response has yet been received.




QIC Noosa Civic Pty Ltd                           Version 1                                     November 2014
engineering report_final.docx                                                                         Page v
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.