Original source · versioned page text
MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 96, section 1. The text section number identifies this passage in the reader.
Noosa Civic Construction Environmental Management Plan 3 Environmental Management Plan Preamble 3.1 Legislative Framework The Environmental Protection Act 1994 (EP Act) protects environmental values through development and implementation of environmental protection policies and regulates environmentally relevant activities prescribed in the Environmental Protection Regulation 2008 (EP Reg). The EP Reg provides details for matters dealt with in the EP Act, including procedures for environmental impact statements, environmentally relevant activities, and environmental nuisance. The Environmental Protection (Water) Policy 2009 (EPP Water) ensures protection of environmental values from activities that may result in the release of contaminants to watercourses or stormwater drains. The Environmental Protection (Air) Policy 2008 (EPP Air) ensures protection of ambient air quality and specifies indicators and air quality goals for control of the release of airborne contaminants. The Environmental Protection (Noise) Policy 2008 (EPP Noise) specifies an acoustic quality objective for the protection of well-being and amenity of individuals and the community in residential areas. Planning noise levels are also specified for development of beneficial assets. The Nature Conservation Act 1992 (NC Act) and subordinate legislation provides a framework for the conservation of nature, by specifying management principles and intents for areas and species of conservation significance. The Vegetation Management Act 1999 (VM Act) and subordinate legislation regulates the clearing of native vegetation mapped as either remnant vegetation on a regional ecosystem (RE) map or remnant map, or regulated regrowth vegetation identified on a regrowth vegetation map, as well as native woody vegetation on State lands. The Sustainable Planning Act 2009 (SPA), together with the subordinate Sustainable Planning Regulation 2009 (SPR), seeks to achieve ecological sustainability by managing the process by which development takes place, managing the effects of development on the environment, and continuing the coordination and integration of planning at the local, regional and State levels. The Land Protection (Pest and Stock Route Management) Act 2002 governs the management of pest plants and animals, and the application of controls and restrictions on ‘declared pests’. The Aboriginal Cultural Heritage Act 2003 defines the duty of care to ensure that all reasonable and practical measures are taken to prevent damage to places and objects of Aboriginal cultural, historical or archaeological significance. The Work Health and Safety Act 2011 ensures protection of all personnel and the environment when storing and handling dangerous goods. 3.2 Terminology The term Act refers to the EP Act 1994. The term the proponent or the operator refers to QIC Noosa Civic Pty Ltd. The term NSC refers to the Noosa Shire Council. The term CEMP refers to this Construction Environmental Management Plan. The term DEHP refers to the Department of Environment and Heritage Protection. The term Environmental Officer refers to the person nominated by the Contractor to oversee environmental matters mentioned within this CEMP. The terms Principal, Superintendent, Contractor and Works shall have the meaning assigned to them under the Contract. It is understood that the Project Manager will be the Contractor’s representative onsite. Noosa Civic Version 1 November 2014 Appendix B - Construction EMP.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.