Geotech 95141.00.R.001
From the archive Stormwater Submission.zip, inside Operational Works Application OPW21/0272 Submission - DA Form 1 - Plans - Geotech Report - 32 Viewland Dr, Noosa Heads. File date in the archive: 2021-03-11 08:38.
Page 4 of 10
Table 1: Results of Plasticity and Particle Size Distribution Testing
Bore Depth Material FMC Plasticity Particle Size Distribution %
No. (m) (%)
LL PL PI LS Gravel Sand Silt/Clay
(%) (%) (%) (%)
1 1.4-1.8 SAND 2.5 - - NP - 0 97 3
5 0.4-0.8 SAND 2.3 - - NP - 0 96 4
Where FMC = Field Moisture Content, LL = Liquid Limit, PL = Plastic Limit, PI = Plasticity Index, LS = Linear Shrinkage,
NP = Non Plastic
6. Comments
6.1 Site Preparation and Earthworks
It is recommended that the following site preparation and earthworks procedures be carried out where
the proposed development will consist of new fill, slab-on-ground construction and/or pavement
construction. Site preparation measures are detailed below:
• All earthworks should be carried out in accordance with AS 3798 (2007).
• Any deleterious, soft, wet or highly compressible material or topsoil material rich in organics or root
matter should be stripped and removed. No topsoil or organic material was recorded at the bore
locations, but a shallow root zone associated with vegetation may be expected.
• The stripped surface should be rolled with at least six passes of a minimum 12 tonne deadweight
roller (or as large as practicable), with a final test roll pass accompanied by careful visual inspection
to detect the presence of any soft or loose spots. Areas demonstrating excessive movement under
test rolling will be required to be either tyned, dried and recompacted or removed and replaced with
select fill well compacted in layers. Treatment should be to a standard sufficient so that the
subgrade passes test rolling and that compaction can be achieved in the first layer of filling. The
extent of treatment is best assessed at the time of construction, but large areas of excavation
should not proceed without geotechnical advice to assess other options.
• Depressions formed by the removal of vegetation should have all disturbed, weakened soil cleaned
out and then backfilled with select fill well compacted in layers.
• It is recommended that where filling is to be carried out over sloping ground (exceeding 8H:1V in
slope), the slope should be benched to allow for the filling to be 'keyed' into the existing slopes.
These procedures will provide greater stability of the filling and allow for adequate compaction to
be achieved throughout the full depth of the filling. Filled batters should also be overfilled and then
cut back to the required design batter angles in order to maximise compaction of the material in the
batter faces.
• Based on the ground conditions encountered, excavations in the site soils could be undertaken
using conventional small to medium sized earthmoving equipment, such as drotts, backhoes or 5 t
to 15 t (or larger) excavators.
Geotechnical Investigation, Proposed Youngcare Facility 95141.00.R.001.docx
32 Viewland Drive, Noosa Heads January 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.