Original source · versioned page text
INTEGRATED WATER QUALITY MONITORING PROGRAM - BURGESS CREEK · Unitywater Burgess Creek REMP 2022 Annual Review (A7703347)
Burgess Creek Monitoring Program
Annual Review 2022
• Chloropyll a pheophytin ratio spiked at all sites in August and December.
• High variability in suspended solids with notable spikes across all sites in February,
May and November with an additional outlying spike occurring at B1 in September.
• Water flow remained between 2 and 4 throughout the year across most sites with the
exception on B8 that only experienced water flow in May and B2 having a reduction in
flow in September.
Figure 23. The temporal variability of the concentration of E.coli during 2021.
4500
4000
3500
E.coli (cfu/100mL)
3000
2500
2000
1500
1000
500
0
Month Sampled
Site SW3 Site B1 Site B5 Site B6 Site B3 Site B8 Site B2
This document may not, in whole or part, be copied, photocopied, reproduced,
or translated without prior consent from the CEO, Unitywater. Page 24 of 64
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.