Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

OPW11/0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville

of 57

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (70.0 MB): may take a few minutes to open.

Log in to see the plans as drawn
      BUNNINGS WAREHOUSE, NOOSAVILLE
      SURFACE WATER MANAGEMENT PLAN                                                    11^4^ Cardno

                           Maintenance is primarily concerned with:

                               •       Maintenance of flow to and through the bio-retention basin
                               •       Maintaining vegetation
                               •       Preventing undesired overgrowth vegetation from taking over the bio-
                                       retention basin
Ej:                            •       Removal of accumulated sediments
                               •       Litter and debris removal

                           Vegetation maintenance will include:

                                •      Fertilising plants
                                   •   Removal of noxious plants or weeds
                                •      Re-establishment of plants that die.

                           Sediment accumulation at the inlets needs to be monitored. Depending on the
                           catchment activities (eg building phase) the deposition of sediment can tend to
                           smother plants and reduce the ponding volume available. Should excessive
                           sediment build up it will impact on plant health and require removal before it
                           reduces the infiltration rate of the filter media.

                           Similar to other types of practices, debris removal is an ongoing maintenance
                           function. Debris, if not remove, can block inlets or outlets, and can be unsightly
                           if located in a visible location. Inspection and removal of debris should be done
                           regularly, but debris should be removed whenever observed on the site."

                  Given the above, a three monthly inspection frequency is proposed until the catchment has


r.                become stabilised (i.e. until the development is largely complete). After this time, the
                  frequency of inspections can be reduced to every six months or as determined by the
                  operational performance of the devices.




I
I
r
I
      Bunnings Warehouse                                          Version 1                         15 December 2006
      J \3501-541WPnSWMP.doc                                Commercial in Confidence                        Page 17

Used in these records

About this file

File size
70.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0023 Development Application part 2 of 2 Planning Report and Plans 178 Eumundi Noosa Road Noosaville.pdf · 70.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.