Attachment 4 - Geotech Report · MCU23/0030
50 NOOSA PARADE, NOOSA HEADS PROPOSED RESIDENCE 6.1.3 Material Re-Use Materials excavated for the basement are expected to comprise mostly sands, with some sandy clays. These materials should generally be suitable for re-use as structural fill, subject to appropriate moisture adjustment for the placement of such materials, and treatment of ASS where necessary. Internal dewatering prior to bulk excavation (within a perimeter wall system) would be prudent to enable easier handling of excavated sand materials for off-site transport and re-use, particularly if groundwater is shallow at the time of construction. It is estimated that the sands would have CBR values of 7 % or higher once compacted to at least 95 % Standard density. 6.1.4 Trafficability After stripping and excavation to the design levels, the basement subgrade is expected to consist of loose to medium dense natural sands; with the remainder of the site subgrade in near surface areas (following stripping) expected to feature loose sands (historic fill). Following site preparation, and bulk excavation for the basement, the subgrade must be inspected by a suitably qualified and experienced geotechnical RPEQ to determine whether any over-excavation is required to achieve a stable subgrade for construction activities, and a suitable subgrade for the preferred foundation solution (Ref. Section 6.3). Where poorly graded, fine grained sands and/or high silt contents are encountered in the subgrade materials, they could be subject to strength loss from repetitive vehicle loading or if they are left / become saturated. Thus, the measures outlined below are recommended: Grade the base of the excavation (minimum 1V:100H) to achieve positive drainage to a dewatering point(s) (e.g. sump-pump), with collected waters then pumped to a suitable discharge outlet (after treatment to a suitable quality). Adequate internal dewatering will need to be maintained to achieve trafficability. Place non-woven geosynthetic filter fabric (e.g. Bidim or equivalent) across the subgrade to prevent ‘pumping’ of ‘fines’ (silt materials) into the rock fill working platform. The grade of geosynthetic to be used will be dependent upon the particle size of the selected granular material used (see below). Construct a minimum 150 mm thick granular working platform to the design subgrade level. We suggest the use of 75 mm to 150 mm rock fill with a thin capping layer of CBR 15 % material to provide a smooth working surface. Specific design will need to be carried out to determine working platform requirements for any heavy plant (e.g. mobile cranes or piling rigs), and a thicker rock fill platform may be required than recommended above. 6.1.5 Filling Based on the supplied architectural drawings, and the proposed construction methodologies, minimal structural filling works are anticipated as part of the development. To achieve non-worsening of the global stability of the rock revetment along the river to the north, filling should not exceed 0.5 m high above the existing ground surface unless assessed and approved by a geotechnical RPEQ prior to construction. It is recommended that any imported fill for the project comprise good quality, low reactivity materials (e.g. non-descript crushed rock, ‘clean’ sands, or similar), that comply with the following: Minimum CBR of 10 % Maximum plasticity index of 15 % Shrink-swell index ≤ 1 % Maximum particle size of 100 mm Fill material should be placed in 200 mm thick (loose thickness) layers and be compacted by repeated rolling using a minimum 4 tonne roller (vibration on if safe to do so) to achieve a dry density ratio of at least 95 % of the maximum Dry Density Ratio (DDR), based upon the Standard Compaction method, or a Dry Density Index of at least 70 %. Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per vertical lift is recommended where structural fill heights are to exceed 300 mm. Further 2 February 2023 Report No. 22500-001-Rev0 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.