Attachment 7B - Site Based Stormwater Manamgment Plan by ADG
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
5 STORMWATER QUANTITY ASSESSMENT
The aim of the stormwater quantity assessment is to ensure that the development shall impose no
adverse effects on downstream properties or receiving water bodies and that the conveyance of
flows will be in a safe manner with minimal risk of human endangerment as well as the following
objectives:
Address the need for stormwater quantity control measures.
Ensure there is no actional impacts from the subject site for events up to and including the 1% AEP
event.
Ensure proposed quantity control measures detain and convey flows in accordance with QUDM
(2017) minimum freeboard recommendations.
5.1 Proposed Development and Associated Issues
In this development, the developable site area leads to negligible increase in peak flows downstream
of the subject site and is located close to the downstream waterway being Weyba Creek, hence in
the lower portion of the regional catchment. It is anticipated that the bio-retention drainage system
will allow for infiltration on-site of the additional flows which will permeate into the sub-surface strata,
hence it is considered unnecessary to include provision for stormwater quantity management.
6 STORMWATER QUALITY ASSESSMENT
6.1 Treatment Objectives
This assessment identifies issues relating to stormwater quality runoff and assesses possible
methods of treatment if required. The aim of this section of the report is to determine practical
approaches for achieving improvements in the quality of the stormwater run-off from the site that can
be readily implemented.
The SPP 2017 proposes criteria which apply to ‘high-risk’ development for stormwater. The criteria
include one or more of the following:
A Material Change of Use (MCU) for an urban purpose which involves greater than 2,500m2 of
land that:
will result in an impervious area greater than 25% of the net developable area; or
will result in six (6) or more dwellings
A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
2,500m2 and will result in six (6) or more lots; or
Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
The proposal includes an MCU for a land area of 2,500m 2 that will result in impervious area greater
than 25% of the developable area. Hence, the development is classed as ‘high risk’ for water quality
and the SPP 2017 applies.
The SPP 2017 suggests the development aims to:
Avoid or otherwise minimises adverse impacts on the environmental values of receiving waters,
arising from:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.